12.07.2015 Views

Installation Operation Maintenance

Installation Operation Maintenance

Installation Operation Maintenance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General Start-up<strong>Installation</strong> checklistThis list must be checked off by the installer to ensure correct installation before the unit start up.UNIT POSITIONCheck clearance around condenserCheck clearance required for maintenance accessCheck type and position of rubbers padsCheck unit is levelCHILLED WATER CIRCUITCheck thermometers and manometers presence and positionCheck water flow rate balancing valve presence and positionCheck presence of strainer ahead of evaporatorCheck presence of air-purge valveCheck rinsing and filling of chilled water pipesCheck water pump(s) contactor interconnected to control panelCheck water flowCheck chilled water pressure drop or unit available pressure (units with hydraulic module)Check for leaks in chilled water pipesELECTRICAL EQUIPMENTCheck installation and rating of mains power switch/fusesCheck electrical connections complied with specificationCheck that electrical connections are in accordance with information on manufacturer's identification plateCheck direction of rotation using phasemeterComments……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………Signature:…………………………………………………………………….Name:…………………………………...…………………Order N°: ……………………………………………………………………………………………………………………………………Work site: ……………………………………………………………………………………………………………………………………Please return to your local Trane Service OfficeCG-SVX06A-E445

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!