Installation Operation Maintenance
Installation Operation Maintenance
Installation Operation Maintenance
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Installation</strong>Figure 4 - CCUN hydraulic flow chart - without hydraulic module1 2 33CW41. Insulated evaporator2. Valve for air vent3. ¼ SAE Male pressure tab4. ¼ SAE Male drain tab5. Condenser6. Water strainer7. Expansion Tank8. Pressure relief valve9. Single or double evaporator pump10. Drain pan11. Condenser pump12. Check valveCW: Chilled water loopHW: Condensation water loopTT: Temperature sensorPi: Pressure gaugeFT: Water flow switchA: For sizes 205 to 207 standard head 3"B: For sizes 208 to 211 and all sizes high 4"16CG-SVX06A-E4