12.07.2015 Views

Installation Operation Maintenance

Installation Operation Maintenance

Installation Operation Maintenance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Installation</strong>HandlingA specific lifting method isrecommended as follows:1. 4 lifting points are built into theunit.2. Slings and spreader bar to beprovided by rigger and attachedto the 4 lifting points.3. Minimum rated lifting capacity(vertical) of each sling andspreader bar shall be no lessthan the tabulated unit shippingweight. Refer to Figures 1 and 2CAUTION: This unit must be liftedwith the outmost care. Avoid shockload by lifting slowly and evenly. Toprevent any damage, position thelifting bar so that the slings do nottouch the unit.Figure 1 - Rigging the unit - CGWN - CCUNABCDCG-SVX06A-E411

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!