12.07.2015 Views

LM Guide THK - Industrial Technologies

LM Guide THK - Industrial Technologies

LM Guide THK - Industrial Technologies

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Индастриал Технолоджис www.industrial‐technologies.com.ua +38 044 498 21 94SNR/SNSCaged Ball <strong>LM</strong> <strong>Guide</strong>sB Product SpecificationsDimensional Drawing, Dimensional TableModels SNR-R and SNR-LR.............Models SNS-R and SNS-LR .............Models SNR-C and SNR-LC.............Models SNS-C and SNS-LC .............Models SNR-RH (Build to Order)and SNR-LRH (Build to Order) ......Models SNS-RH (Build to Order)and SNS-LRH (Build to Order) ......Models SNR-CH (Build to Order)and SNR-LCH (Build to Order) ......Models SNS-CH (Build to Order)and SNS-LCH (Build to Order) ......Standard Length and Maximum Lengthof the <strong>LM</strong> Rail...................................Options.............................................The <strong>LM</strong> Block Dimension (Dimension L)with LaCS and Seals Attached...........Incremental Dimension with Grease Nipple(When LaCS is Attached) ....................Dedicated Bellows JSNfor Models SNR and SNS..............Cap C ................................................Cap GC .............................................<strong>LM</strong> Block Dimension (Dimension L)with QZ Attached ...........................B1-26B1-28B1-30B1-32B1-34B1-36B1-38B1-40B1-42B1-235B1-236B1-243B1-249B1-262B1-263B1-264A Technical Descriptions of the Products(Separate)Technical DescriptionsStructure and Features .....................Types and Features ..........................Rated Loads in All Directions............Equivalent Load ................................Service Life .......................................Radial Clearance Standard...............Accuracy Standards..........................Shoulder Height of the Mounting Baseand the Corner Radius ......................Error Allowance in the ParallelismA1-125A1-126A1-129A1-129A1-76A1-89A1-95A1-309between Two Rails ................ A1-315/A1-316Error Allowance in Vertical Levelbetween Two Rails ................ A1-318/A1-319<strong>Industrial</strong> <strong>Technologies</strong>* Please see the separate "A Technical Descriptionsof the Products".B1-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!