12.07.2015 Views

LM Guide THK - Industrial Technologies

LM Guide THK - Industrial Technologies

LM Guide THK - Industrial Technologies

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Индастриал Технолоджис www.industrial‐technologies.com.ua +38 044 498 21 94Mounting Procedure and Maintenance<strong>LM</strong> <strong>Guide</strong>Mounting the <strong>LM</strong> <strong>Guide</strong>0Mounting Procedure[Example of Mounting the <strong>LM</strong> <strong>Guide</strong> When an Impact Load is Applied to the Machine andtherefore Rigidity and High Accuracy are Required]Subsidiary-rail sideTableBaseFig.1 When an Impact Load is Applied to the Machine• Mounting the <strong>LM</strong> Rail(s)(1) Be sure to remove burr, dent and dust fromthe mounting surface of the machine towhich the <strong>LM</strong> <strong>Guide</strong> is to be mountedbefore installing the <strong>LM</strong> <strong>Guide</strong>. (Fig.2)Note) Since the <strong>LM</strong> <strong>Guide</strong> is coated with anti-rust oil,remove it from the reference surface by wipingthe surface with washing oil before using theguide. Once the anti-rust oil has been removed,the reference surface is prone to getting rusted.We recommend applying low-viscosity spindleFig.2 Checking the Mounting Surfaceoil.(2) Gently place the <strong>LM</strong> rail onto the base, andtemporarily secure the bolts to the extentthat the <strong>LM</strong> rail lightly contacts the mountingsurface (align the line-marked side of the<strong>LM</strong> rail with the side reference-surface ofthe base). (Fig.3)Note) The bolts for securing the <strong>LM</strong> <strong>Guide</strong> must beclean. When placing the bolts into the mountingholes of the <strong>LM</strong> rail, check if the bolt holes aredisplaced.(Fig.4) Forcibly tightening the bolt intoa displaced hole may deteriorate the accuracy.<strong>LM</strong> block set screwMaster rail side<strong>LM</strong> rail set screwFig.3 Aligning the <strong>LM</strong> Rail with the Reference-Surface<strong>Industrial</strong> <strong>Technologies</strong>Fig.4 Checking with the Bolt for an AllowanceA1-322

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!