12.07.2015 Views

Download PDF - Honda of the UK Manufacturing Ltd

Download PDF - Honda of the UK Manufacturing Ltd

Download PDF - Honda of the UK Manufacturing Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.1 FIRE (Continued)Fire FightingIf a fire were to take place at HUM <strong>the</strong> priority is to ensure safe evacuation.Stratton Fire Station is only 2 minutes away from <strong>the</strong> main site entrance and regular liaison is carried out to ensure allcrews are familiar with emergency arrangements and site layout. This enables <strong>the</strong> fire and emergency authorities toupdate tactical information, which is held at <strong>the</strong> main site entry point.Physical fire fighting controls are also in place. These include:• All areas except die casting have fire sprinklers.• Fire extinguishers in all areas including large trolley mounted extinguishers in higher risk areas and water hydrantring main around both plants.• Fire management computer system automatically shuts down high risk areas such as Paint and <strong>the</strong> petrol deliverysystem. It also opens security locked doors.• Specially designed solvent storage and mix rooms in Paint and Bumper Paint.• Emergency cabinets containing equipment and tools likely to be required in an emergency.• All fire equipment is regularly maintained.The effectiveness <strong>of</strong> <strong>the</strong>se controls is reviewed in each department through <strong>the</strong> company safety audit system.Activities and Improvements in 2010Easy to Identify Fire ExtinguishersThere were a total <strong>of</strong> 12 minor fires during <strong>the</strong> last year details <strong>of</strong> <strong>the</strong> cause and countermeasure <strong>of</strong> <strong>the</strong>se is detailed insection 3.6. Fire sweeps <strong>of</strong> each area hasve now been increased with <strong>the</strong> concern items from 2010 reflected into <strong>the</strong> firesweep check sheet.In addition in 2010 <strong>the</strong> following improvements were implemented:• All fire drills were completed according to schedule using <strong>the</strong> hard and s<strong>of</strong>t fire drills method introduced in 2009.• A total <strong>of</strong> 158 people completed fire extinguisher training including 33 trained in <strong>the</strong> use <strong>of</strong> <strong>the</strong> Class D fireextinguisher for metal fires from <strong>the</strong> Die Cast area.• The site wide fire risk assessment was completed by an external company and while no major concerns werehighlighted a small number <strong>of</strong> minor issues were raised, which will be counter measured in <strong>the</strong> first part <strong>of</strong> 2011.SE/D/G/15 - Nov 2011www.hondamanufacturing.co.uk21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!