12.07.2015 Views

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project NameJarvis East<strong>Training</strong> <strong>Area</strong><strong>Training</strong> <strong>Area</strong>Rotation PlanProject DescriptionThe Jarvis East <strong>Training</strong> <strong>Area</strong>, located within the Donnelly <strong>Training</strong> <strong>Area</strong>, Alaska, is used by troops tomaintain military readiness <strong>and</strong> preparedness. Impacts from the use of the area are typical of militarytraining exercises <strong>and</strong> include trail proliferation, vegetation damage, exposure of soil, road <strong>and</strong> traildegradation <strong>and</strong> impaired access. These impacts, if left untreated, can decline <strong>and</strong> result in erosion <strong>and</strong>impaired drainage/hydrology. This project will mitigate training impacts by improving the health ofexisting vegetation through mowing, hydro-axing <strong>and</strong> fertilizing; the establishment of new vegetation inexposed area by hydro-seeding; the closing of unnecessary trails; the improvement of drainage throughgrading <strong>and</strong> the installation of water bars <strong>and</strong> culverts; <strong>and</strong> the reshaping <strong>and</strong> restoration of areasdamaged by vehicles <strong>and</strong> equipment.ApproximateAcresImpacted27Jarvis West<strong>Training</strong> <strong>Area</strong><strong>Training</strong> <strong>Area</strong>Rotation PlanDonnelly<strong>Training</strong> <strong>Area</strong><strong>Training</strong> <strong>Area</strong>Rotation PlanOP RoadDrainageUpgrades33 Mile LoopRoad Phase 8A33 Mile LoopRoad Phase 8B33 Mile LoopRoad Phase 1RepairThe Jarvis West <strong>Training</strong> <strong>Area</strong>, located within the Donnelly <strong>Training</strong> <strong>Area</strong>, Alaska, is used by troops tomaintain military readiness <strong>and</strong> preparedness. Impacts from the use of the area are typical of militarytraining exercises <strong>and</strong> include trail proliferation, vegetation damage, exposure of soil, road <strong>and</strong> traildegradation <strong>and</strong> impaired access. These impacts, if left untreated, can decline <strong>and</strong> result in erosion <strong>and</strong>impaired drainage/hydrology. This project will mitigate training impacts by improving the health ofexisting vegetation through mowing, hydro-axing <strong>and</strong> fertilizing; the establishment of new vegetation inexposed area by hydro-seeding; the closing of unnecessary trails; the improvement of drainage throughgrading <strong>and</strong> the installation of water bars <strong>and</strong> culverts; <strong>and</strong> the reshaping <strong>and</strong> restoration of areasdamaged by vehicles <strong>and</strong> equipment.The Donnelly <strong>Training</strong> <strong>Area</strong>, located within the Donnelly <strong>Training</strong> <strong>Area</strong>, Alaska, is used by troops tomaintain military readiness <strong>and</strong> preparedness. Impacts from the use of the area are typical of militarytraining exercises <strong>and</strong> include trail proliferation, vegetation damage, exposure of soil, road <strong>and</strong> traildegradation <strong>and</strong> impaired access. These impacts, if left untreated, can decline <strong>and</strong> result in erosion <strong>and</strong>impaired drainage/hydrology. This project will mitigate training impacts by improving the health ofexisting vegetation through mowing, hydro-axing <strong>and</strong> fertilizing; the establishment of new vegetation inexposed area by hydro-seeding; the closing of unnecessary trails; the improvement of drainage throughgrading <strong>and</strong> the installation of water bars <strong>and</strong> culverts; <strong>and</strong> the reshaping <strong>and</strong> restoration of areasdamaged by vehicles <strong>and</strong> equipment.This project will improve a 7000 m section of an existing road. OP Road is a major route for troopactivities occurring along the western edge of the Donnelly East <strong>Training</strong> <strong>Area</strong>s. This section of road ischaracterized by steep hilly terrain, adverse slope concentrated rill erosion <strong>and</strong> soft wet areas in poorlydrained road saddles. This project will improve access <strong>and</strong> control erosion by improving drainage throughgrading, re-establishing ditches, road crown, out/in slopes <strong>and</strong> the installation of water bars.This project will improve a 2250 m section of an unimproved existing road base on the southern end of 33Mile Loop Road. This road is the main route for troop activities within 6 major training areas. Thissection of road is essentially inaccessible to military vehicles due large erosion features from poordrainage <strong>and</strong> deep ruts. This project will extend the length of improvements from 33 Mile Loop RoadPhase 7B <strong>and</strong> will improve access <strong>and</strong> control erosion by improving drainage through grading, reestablishingditches, cutouts <strong>and</strong> the installation of geotextile <strong>and</strong> fill material. This project will alsominimize impacts to sensitive cultural sites by controlling off road access through the installation of rockbarriers.This project will improve a 2000 m section of an unimproved existing road base on the southern end of 33Mile Loop Road. This road is the main route for troop activities within 6 major training areas. Thissection of road is essentially inaccessible to military vehicles due large erosion features from poordrainage <strong>and</strong> deep ruts. This project will extend the length of improvements from 33 Mile Loop RoadPhase 8A to the Jarvis Creek low water crossing <strong>and</strong> will improve access <strong>and</strong> control erosion byimproving drainage through grading, re-establishing ditches <strong>and</strong> the installation of geotextile <strong>and</strong> fillmaterial.This project will improve a 1750 m section of previously improved road on the northern end of 33 MileLoop Road adjacent to Eddy Drop Zone. This road is the main route for troop activities within 6 majortraining areas. This section of road was impaired from a significant flood overflow event from JarvisCreek that washed away the majority of road base material exposing geotextile. In addition, ditches, lowwater crossings <strong>and</strong> culverts were compromised. This project will re-establish the road <strong>and</strong> drainagefeatures through grading, ditching <strong>and</strong> the installation of geotextile, fill material, culverts <strong>and</strong> mortaredlow water crossings.272717.32.324.4_____________________________________________________________________________________________Environmental AssessmentUnited States Army Alaska, <strong>Integrated</strong> <strong>Training</strong> <strong>Area</strong> <strong>Management</strong> Program<strong>Management</strong> Plan A-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!