Project NameDonnelly <strong>Training</strong> <strong>Area</strong>Buffalo DropZone AccessPhase 1Buffalo DropZone AccessPhase 2Project DescriptionThis project will improve a 1500 m section of an existing road leading into the Buffalo Drop Zone off of33 Mile Loop Road. The road intersects the Richardson Highway <strong>and</strong> is the main entry point for troopactivities within 6 major training areas. This section of road is characterized by relatively flat slopes thatare poorly drained with two significant erosion features <strong>and</strong> has received significant impacts from Strykertraffic. This project will improve access <strong>and</strong> control erosion by improving drainage through grading, reestablishingditches <strong>and</strong> the installation of geotextile <strong>and</strong> fill material.This project will improve a 5000 m section of an existing road leading into the Buffalo Drop Zone off of33 Mile Loop Road. This road is the main route for troop activities within 6 major training areas. Thissection of road is characterized by long open flat portions with soft areas that are insufficiently drained<strong>and</strong> has received significant impacts from Stryker traffic. This project will extend the length ofimprovements from BDZ Access PH 1 <strong>and</strong> will improve access <strong>and</strong> control erosion by improvingdrainage through grading, re-establishing ditches <strong>and</strong> the installation of geotextile <strong>and</strong> fill material.ApproximateAcresImpacted3.712.4Buffalo DropZone AccessPhase 3Meadows RoadUpgrade <strong>and</strong>Repair Phase 1Meadows RoadUpgrade <strong>and</strong>Repair Phase 2Windy RidgeRoad Upgrade<strong>and</strong> Repair Phase1Windy RidgeRoad Upgrade<strong>and</strong> Repair Phase2Buffalo DropZone Vegetation<strong>Management</strong> –BurnBuffalo DropZone Vegetation<strong>Management</strong> –MowThis project will improve a 6500 m section of an existing road leading away from the Buffalo Drop Zoneoff of 33 Mile Loop Road. This road is the main route for troop activities within 6 major training areas.This section of road is characterized by insufficient outsloped curves <strong>and</strong> low soft areas that are poorlydrained <strong>and</strong> have received significant impacts from Stryker traffic. This project will extend the length ofimprovements from BDZ Access PH 2 <strong>and</strong> will improve access <strong>and</strong> control erosion by improvingdrainage through grading, re-establishing ditches <strong>and</strong> the installation of geotextile <strong>and</strong> fill material.This project will improve a 4500 m section of an existing road. Meadows Road is a major route for troopactivities within the OP <strong>and</strong> Bolio training areas <strong>and</strong> the Collective <strong>Training</strong> Range. This section of roadis characterized by poorly drained areas prone to rutting <strong>and</strong> potholes <strong>and</strong> has received significant impactsfrom Stryker traffic. This project will improve access <strong>and</strong> control erosion by improving drainage throughgrading, re-establishing ditches <strong>and</strong> the installation of geotextile <strong>and</strong> fill material.This project will improve a 7000 m section of an existing road. Meadows Road is a major route for troopactivities within the OP <strong>and</strong> Bolio training areas <strong>and</strong> the Collective <strong>Training</strong> Range. This section of roadis characterized by poorly drained areas prone to rutting <strong>and</strong> potholes <strong>and</strong> has received significant impactsfrom Stryker traffic. This project will extend the length of improvements from Meadows Road Upgrade<strong>and</strong> Repair PH 1 <strong>and</strong> will improve access <strong>and</strong> control erosion by improving drainage through grading, reestablishingditches <strong>and</strong> the installation of geotextile <strong>and</strong> fill material.This project will improve a 2250 m section of an existing road. Windy Ridge Road is a major route fortroop activities associated with the Texas <strong>and</strong> Washington Impact Ranges. This section of road ischaracterized by rill erosion, poor drainage <strong>and</strong> wind erosion <strong>and</strong> has received significant impacts fromStryker traffic. This project will improve access <strong>and</strong> control erosion by improving drainage throughgrading, re-establishing ditches <strong>and</strong> the installation of geotextile, fill material <strong>and</strong> water bars.This project will improve a 3000 m section of an existing road. Windy Ridge Road is a major route fortroop activities associated with the Texas <strong>and</strong> Washington Impact Ranges. This road is characterized byrill erosion, poor drainage <strong>and</strong> wind erosion <strong>and</strong> has received significant impacts from Stryker traffic.This project will extend the length of improvements from Windy Ridge Road Upgrade <strong>and</strong> Repair PH 1will improve access <strong>and</strong> control erosion by improving drainage through grading, re-establishing ditches<strong>and</strong> the installation of geotextile, fill material <strong>and</strong> water bars.This project will provide for effect vegetation management within the Buffalo Drop Zone through a 12-year rotational burning cycle, with burning taking place on years 1 <strong>and</strong> 7. Maintaining safe drop zonecondition requires the removal of woody vegetation in favor of native grasses. Burning will be combinedwith rotational mowing to remove live stem <strong>and</strong> woody debris from within the drop zone boundaries. Thisproject will provide for the propagation of native grasses by improving soil conditions through theintroduction of burn residue <strong>and</strong> will maintain effective plant based erosion control by leaving rootmasses intact.This project will provide for effect vegetation management within the Buffalo Drop Zone through a 12-year rotational mowing cycle, with mowing taking place on years 4 <strong>and</strong> 10. Maintaining safe drop zonecondition requires the removal of woody vegetation in favor of native grasses. Mowing will be combinedwith rotational burning to remove live stem <strong>and</strong> woody debris from within the drop zone boundaries. Thisproject will provide for the propagation of native grasses by improving soil conditions through theintroduction of decomposing mulch-type residue <strong>and</strong> will maintain effective plant based erosion controlby leaving root masses intact.16.111.217.35.67.5576576_____________________________________________________________________________________________Environmental AssessmentUnited States Army Alaska, <strong>Integrated</strong> <strong>Training</strong> <strong>Area</strong> <strong>Management</strong> Program<strong>Management</strong> Plan A-7
Project NameEddy Drop ZoneVegetation<strong>Management</strong> –BurnEddy Drop ZoneVegetation<strong>Management</strong> –MowBison PlotVegetation<strong>Management</strong> –BurnBison PlotVegetation<strong>Management</strong> –MowProject DescriptionThis project will provide for effect vegetation management within the Eddy Drop Zone through a 12-yearrotational burning cycle, with burning taking place on years 1 <strong>and</strong> 7. Maintaining safe drop zonecondition requires the removal of woody vegetation in favor of native grasses. Burning will be combinedwith rotational mowing to remove live stem <strong>and</strong> woody debris from within the drop zone boundaries. Thisproject will provide for the propagation of native grasses by improving soil conditions through theintroduction of burn residue <strong>and</strong> will maintain effective plant based erosion control by leaving rootmasses intact.This project will provide for effect vegetation management within the Buffalo Drop Zone through a 12-year rotational mowing cycle, with mowing taking place on years 4 <strong>and</strong> 10. Maintaining safe drop zonecondition requires the removal of woody vegetation in favor of native grasses. Mowing will be combinedwith rotational burning to remove live stem <strong>and</strong> woody debris from within the drop zone boundaries. Thisproject will provide for the propagation of native grasses by improving soil conditions through theintroduction of decomposing mulch-type residue <strong>and</strong> will maintain effective plant based erosion controlby leaving root masses intact.This project will provide for effect vegetation management within the Bison Plots located off of MeadowsRoad through a 6-year rotational cycle of burning, mowing <strong>and</strong> fertilizing, with burning taking place onyear 1. Maintaining healthy grass st<strong>and</strong>s requires the removal of thatch <strong>and</strong> non-desired plant species.Burning will improve soil conditions <strong>and</strong> promote the propagation of mono-type grass st<strong>and</strong>s through theintroduction of burn residue <strong>and</strong> will maintain effective plant based erosion control by leaving rootmasses intact.This project will provide for effect vegetation management within the Bison Plots located off of MeadowsRoad through a 6-year rotational cycle of mowing, burning <strong>and</strong> fertilizing, with mowing taking place onyear 4. Maintaining healthy grass st<strong>and</strong>s requires periodic stem length reduction. Mowing will improvesoil conditions <strong>and</strong> promote the propagation of mono-type grass st<strong>and</strong>s through the introduction ofdecomposing stem debris <strong>and</strong> will maintain effective plant based erosion control by leaving root massesintact.ApproximateAcresImpacted2072074848Bison PlotVegetation<strong>Management</strong> –FertilizeOber <strong>Training</strong><strong>Area</strong> <strong>Training</strong><strong>Area</strong> RotationPlanButch <strong>Training</strong><strong>Area</strong> <strong>Training</strong><strong>Area</strong> RotationPlanObservation Post<strong>Training</strong> <strong>Area</strong><strong>Training</strong> <strong>Area</strong>Rotation PlanThis project will provide for effect vegetation management within the Bison Plots located off of MeadowsRoad through a 6-year rotational cycle of fertilizing, mowing <strong>and</strong> burning, with fertilizing taking place onyears 1 <strong>and</strong> 4. Maintaining healthy grass st<strong>and</strong>s requires the periodic introduction of the essential plantnutrients nitrogen, phosphorous, potassium <strong>and</strong> sulfur. Fertilizing will improve soil conditions <strong>and</strong>promote the propagation of mono-type grass st<strong>and</strong>s through the introduction of additional plant nutrients<strong>and</strong> will maintain effective plant based erosion control by promoting root growth.The Ober <strong>Training</strong> <strong>Area</strong>, located within the Donnelly <strong>Training</strong> <strong>Area</strong>, Alaska, is used by troops to maintainmilitary readiness <strong>and</strong> preparedness. Impacts from the use of the area are typical of military trainingexercises <strong>and</strong> include trail proliferation, vegetation damage, exposure of soil, road <strong>and</strong> trail degradation<strong>and</strong> impaired access. These impacts, if left untreated, can decline <strong>and</strong> result in erosion <strong>and</strong> impaireddrainage/hydrology. This project will mitigate training impacts by improving the health of existingvegetation through mowing, hydro-axing <strong>and</strong> fertilizing; the establishment of new vegetation in exposedarea by hydro-seeding; the closing of unnecessary trails; the improvement of drainage through grading<strong>and</strong> the installation of water bars <strong>and</strong> culverts; <strong>and</strong> the reshaping <strong>and</strong> restoration of areas damaged byvehicles <strong>and</strong> equipment.The Butch <strong>Training</strong> <strong>Area</strong>, located within the Donnelly <strong>Training</strong> <strong>Area</strong>, Alaska, is used by troops tomaintain military readiness <strong>and</strong> preparedness. Impacts from the use of the area are typical of militarytraining exercises <strong>and</strong> include trail proliferation, vegetation damage, exposure of soil, road <strong>and</strong> traildegradation <strong>and</strong> impaired access. These impacts, if left untreated, can decline <strong>and</strong> result in erosion <strong>and</strong>impaired drainage/hydrology. This project will mitigate training impacts by improving the health ofexisting vegetation through mowing, hydro-axing <strong>and</strong> fertilizing; the establishment of new vegetation inexposed area by hydro-seeding; the closing of unnecessary trails; the improvement of drainage throughgrading <strong>and</strong> the installation of water bars <strong>and</strong> culverts; <strong>and</strong> the reshaping <strong>and</strong> restoration of areasdamaged by vehicles <strong>and</strong> equipment.The Observation Post <strong>Training</strong> <strong>Area</strong>, located within the Donnelly <strong>Training</strong> <strong>Area</strong>, Alaska, is used bytroops to maintain military readiness <strong>and</strong> preparedness. Impacts from the use of the area are typical ofmilitary training exercises <strong>and</strong> include trail proliferation, vegetation damage, exposure of soil, road <strong>and</strong>trail degradation <strong>and</strong> impaired access. These impacts, if left untreated, can decline <strong>and</strong> result in erosion<strong>and</strong> impaired drainage/hydrology. This project will mitigate training impacts by improving the health ofexisting vegetation through mowing, hydro-axing <strong>and</strong> fertilizing; the establishment of new vegetation inexposed area by hydro-seeding; the closing of unnecessary trails; the improvement of drainage throughgrading <strong>and</strong> the installation of water bars <strong>and</strong> culverts; <strong>and</strong> the reshaping <strong>and</strong> restoration of areasdamaged by vehicles <strong>and</strong> equipment._____________________________________________________________________________________________Environmental AssessmentUnited States Army Alaska, <strong>Integrated</strong> <strong>Training</strong> <strong>Area</strong> <strong>Management</strong> Program<strong>Management</strong> Plan A-848272727
- Page 1:
DEPARTMENT OF THE ARMYUNITED STATES
- Page 5 and 6:
TABLE OF CONTENTSCHAPTER 1: PURPOSE
- Page 7 and 8:
Table 3.9 Summary of Impacts to Hum
- Page 9 and 10:
and Training Land Program, the rang
- Page 11 and 12:
• Establish a defined land condit
- Page 13:
Donnelly Training AreaDonnelly Trai
- Page 17 and 18:
determine whether additional NEPA a
- Page 19 and 20:
Table 2.2 Summary of Environmental
- Page 21 and 22:
CHAPTER 3: DESCRIPTION OF THE AFFEC
- Page 23 and 24:
Maneuver Trail Maintenance and Upgr
- Page 25 and 26:
Mungoven 2001). Engineering soil ty
- Page 27 and 28:
projects and would result in wide,
- Page 29 and 30:
growth. Wind and sand fences would
- Page 31 and 32:
iological impacts of military train
- Page 33 and 34:
willow scrub communities are common
- Page 35 and 36:
disturbed. Further, hardening low w
- Page 37 and 38:
disturbance or removal, best manage
- Page 39 and 40:
SRAThrough the SRA program, soldier
- Page 41 and 42: Ship Creek (from the Glenn Highway
- Page 43 and 44: effective site drainage. Required p
- Page 45 and 46: Game 1998). More information on wil
- Page 47 and 48: Fort Wainwright and associated land
- Page 49 and 50: Long-term beneficial impacts to wil
- Page 51 and 52: 1998).The Alaska Interagency Wildla
- Page 53 and 54: Prescribed burns, mechanical thinni
- Page 55 and 56: unplanned fires, soldiers are direc
- Page 57 and 58: USARAK also implemented the USARTRA
- Page 59 and 60: LRAM projects beneficial to public
- Page 61 and 62: Cumulative ImpactsPast military act
- Page 63 and 64: Two surveys conducted on Yukon Trai
- Page 65 and 66: LRAM activities under Alternative 1
- Page 67 and 68: 3.9.1 Affected EnvironmentFort Rich
- Page 69 and 70: SRA program, which educates soldier
- Page 71 and 72: 3.10.2 Environmental ConsequencesAl
- Page 73 and 74: Fort Richardson receives few compla
- Page 75 and 76: Table 3.11 Summary of Impacts 1 to
- Page 77 and 78: oads and hauling fill and rock mate
- Page 79 and 80: CHAPTER 4: PREPARERS AND CONTRIBUTO
- Page 81 and 82: Benson, A.M. 1999. Distribution of
- Page 83 and 84: Neely, R. J. 2001. Early Mining His
- Page 85 and 86: CHAPTER 6: AGENCIES AND INDIVIDUALS
- Page 87 and 88: Project NameBulldog TrailWidening P
- Page 89 and 90: Project NameYukon TrainingArea Demo
- Page 91: Project NameYukon TrainingArea Firi
- Page 95 and 96: Project Name33 Mile LoopRoad Shortc
- Page 97 and 98: APPENDIX B: BEST MANAGEMENT PRACTIC
- Page 99 and 100: Sediment Trap(Permanent) SeedingSil
- Page 101 and 102: APPENDIX C: SAMPLE RECORD OF ENVIRO
- Page 103 and 104: APPENDIX D: ITAM PROJECT ASSESSMENT
- Page 105 and 106: Fire ManagementYes No□ □ Could
- Page 107 and 108: APPENDIX E: AGENCY COMMENTSThe foll
- Page 109 and 110: ___________________________________
- Page 111 and 112: ___________________________________
- Page 113 and 114: Sent: Monday, June 13, 2005 5:00 PM
- Page 115 and 116: Second paragraph - I do not underst
- Page 117 and 118: sentence could read, "The trees are
- Page 119 and 120: The third paragraph seems too speci
- Page 121: USARAK does not have a current five