12.07.2015 Views

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project NameBrigadier RoadUpgradeCharlie BatteryForwardOperations BaseYukon <strong>Training</strong><strong>Area</strong> ConvoyLive Fire RangePhase 1Yukon <strong>Training</strong><strong>Area</strong> ConvoyLive Fire RangePhase 2Digital Multi-Purpose <strong>Training</strong>Range/InfantryPlatoon BattleCourse ForwardOperations BasePhase 1Digital Multi-Purpose <strong>Training</strong>Range/InfantryPlatoon BattleCourse ForwardOperations BasePhase 2Digital Multi-Purpose <strong>Training</strong>Range/InfantryPlatoon BattleCourse ForwardOperations BasePhase 3Yukon <strong>Training</strong><strong>Area</strong> Firing Point11 UpgradeYukon <strong>Training</strong><strong>Area</strong> Firing Point12 UpgradeProject DescriptionThis project is located in the YTA <strong>and</strong> will improve a 1200 m section of existing road. This road is amajor access route for the eastern portion of the YTA <strong>and</strong> is characterized by a steep grade exceeding an18% slope, significant concentrated rill erosion <strong>and</strong> unsafe winter driving condition, including trackedvehicles. This project will re-establish a hardened road base with a maximum slope of 12% by installingre-routes, geotextile material <strong>and</strong> fill material <strong>and</strong> will improve access <strong>and</strong> erosion control throughgrading, ditching <strong>and</strong> the confinement of activity to hardened surfaces. In addition, this project willsignificantly improve safety during winter driving conditions.This project is located in the YTA adjacent to Johnson Road will improve a 4.5-acre section associatedwith FP Charlie by hardening a 30 m by 30 m pad <strong>and</strong> a 300 m access road <strong>and</strong> thinning a 2-acre tentarea. A latrine will be constructed on site along with several bermed areas for POL <strong>and</strong> maintenanceactivities. This project will improve access <strong>and</strong> control erosion by improving drainage through grading,establishing ditches, installing geotextile <strong>and</strong> fill material <strong>and</strong> confining activities to hardened surfaces.This project is located in the YTA adjacent to the Stuart Creek Impact <strong>Area</strong> <strong>and</strong> will upgrade a 4 kmsection of existing road by spot hardening, clearing lines of sight <strong>and</strong> installing 2 target objective areas.This area is characterized by steep slopes, rill erosion, poor drainage <strong>and</strong> rutting. This project willimprove access <strong>and</strong> control erosion by improving drainage through grading, establishing ditches,installing geotextile <strong>and</strong> fill material <strong>and</strong> confining activities to hardened surfaces.This project is located in the YTA adjacent to the Stuart Creek Impact <strong>Area</strong> <strong>and</strong> will upgrade a 4 kmsection of existing road by spot hardening, clearing lines of sight <strong>and</strong> installing 3 target objective areas.This area is characterized by steep slopes, rill erosion, poor drainage <strong>and</strong> rutting. This project exp<strong>and</strong>supgrades made in Convoy Live Fire Range Phase 1 <strong>and</strong> will improve access <strong>and</strong> control erosion byimproving drainage through grading, establishing ditches, installing geotextile <strong>and</strong> fill material <strong>and</strong>confining activities to hardened surfaces.This project is located in the YTA within an area formally known as Lower Winter Camp. This projectwill include initial road/pad base hardening of a 500 m by 10 m access trail <strong>and</strong> a 150 m by 150 m pad.The DMPTR/IPBC FOB will exp<strong>and</strong> upgrades made on previous Lower Winter Camp projects <strong>and</strong> willsupport bivouac activities associated with the DMPTR <strong>and</strong> IPBC Ranges. This project will improveaccess <strong>and</strong> control erosion by improving drainage through grading, establishing ditches, installinggeotextile <strong>and</strong> fill material <strong>and</strong> confining activities to hardened surfaces.This project is located in the YTA within an area formally known as Lower Winter Camp. This projectwill exp<strong>and</strong> upgrades from DMPTR/IPBC Fob Phase 1 by installing an intermediate cap on a 500 m by10 m access trail <strong>and</strong> a 150 m by 150 m pad. This project will improve access <strong>and</strong> control erosion byimproving drainage through grading, establishing ditches, installing geotextile <strong>and</strong> fill material <strong>and</strong>confining activities to hardened surfaces.This project is located in the YTA within an area formally known as Lower Winter Camp. This projectwill complete upgrades from DMPTR/IPBC Fob Phase 1 <strong>and</strong> 2 by installing a final cap on a 500 m by 10m access trail <strong>and</strong> a 150m by 150m pad. This project will improve access <strong>and</strong> control erosion byimproving drainage through grading, establishing ditches, installing geotextile <strong>and</strong> fill material <strong>and</strong>confining activities to hardened surfaces.This project is located in the YTA TA 7 <strong>and</strong> will improve an existing firing point that is no longer inuseable condition. This project will upgrade approximately 2.5 acres by clearing vegetation <strong>and</strong> hardeninga 100 m by 100 m pad <strong>and</strong> a 100 m by 10 m access road. This project will improve access <strong>and</strong> controlerosion by improving drainage through grading, establishing ditches, installing geotextile <strong>and</strong> fill material<strong>and</strong> confining activities to hardened surfaces.This project is located in the YTA Stuart Creek Impact <strong>Area</strong> <strong>and</strong> will improve an existing firing point thatis no longer in useable condition. This project will upgrade approximately 2.5 acres by clearingvegetation <strong>and</strong> hardening a 100 m by 100 m pad <strong>and</strong> a 100 m by 10 m access road. This project willimprove access <strong>and</strong> control erosion by improving drainage through grading, establishing ditches,installing geotextile <strong>and</strong> fill material <strong>and</strong> confining activities to hardened surfaces.ApproximateAcresImpacted34.59.910.16.86.86.82.52.5_____________________________________________________________________________________________Environmental AssessmentUnited States Army Alaska, <strong>Integrated</strong> <strong>Training</strong> <strong>Area</strong> <strong>Management</strong> Program<strong>Management</strong> Plan A-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!