12.07.2015 Views

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX A: LRAM FIVE-Y<strong>EA</strong>R PROJECT LISTThis is a proposed project list that will be continually updated. All projects may not be implementedwithin five years <strong>and</strong> additional projects may be added.Project NameFort RichardsonProject DescriptionApproximateAcresImpacted<strong>Training</strong> <strong>Area</strong>Rotation PlanImplementationfor <strong>Training</strong><strong>Area</strong>s 1B & 1CBunker HillManeuverCorridorThinning Phase 3M16 RecordRange (widenservice roads to20 feet)M16 RecordRange Bermerosion control(144) bermsEngineerExpresswayWidening Phase 1Bulldog TrailWidening Phase 2<strong>Training</strong> <strong>Area</strong>Rotation PlanImplementationfor <strong>Training</strong><strong>Area</strong>s 2A & 2BEngineerExpresswayWidening Phase 2These areas, located at Fort Richardson, Alaska, are used by troops to maintain military readiness <strong>and</strong>preparedness. Impacts from the use of the area are typical of military training exercises <strong>and</strong> include trailproliferation, vegetation damage, exposure of soil, road <strong>and</strong> trail degradation <strong>and</strong> impaired access. Theseimpacts, if left untreated, can decline <strong>and</strong> result in erosion <strong>and</strong> impaired drainage/hydrology. This projectwill mitigate training impacts by improving the health of existing vegetation through mowing, hydroaxing<strong>and</strong> fertilizing; the establishment of new vegetation in exposed area by hydro-seeding; the closingof unnecessary trails; the improvement of drainage through grading <strong>and</strong> the installation of water bars <strong>and</strong>culverts; <strong>and</strong> the reshaping <strong>and</strong> restoration of areas damaged by vehicles <strong>and</strong> equipment.This project will create maneuverable lanes through the forested area to provide realistic overl<strong>and</strong> trainingopportunities for soldiers. The tree thinning treatments are designed specifically for the Stryker vehicle.The treatments used will be designed to minimize stump height <strong>and</strong> residual slash, maintain a safeoperation width between trees, <strong>and</strong> maximize concealment <strong>and</strong> cover.This project will improve the existing roads <strong>and</strong> will re-establish hardened road surfaces <strong>and</strong> drainagefeatures, including crowns, out/in slopes, ditches, water bars <strong>and</strong> culverts. These sections of road networkwithin the range are characterized by poor drainage, insufficient <strong>and</strong> inappropriate road base <strong>and</strong> capmaterial, rutting <strong>and</strong> large erosion features, which impede access. These projects will improve access <strong>and</strong>control erosion by improving drainage through grading, ditching, installing geotextile <strong>and</strong> fill material<strong>and</strong> confining activities to hardened surfaces.This project will re-establish 144 existing range berms at the M16 Record Range. These berms arecharacterized by eroding features that impede training opportunities. This project will improve training byrestoring <strong>and</strong> revegetating the eroded berms to a state suitable for training.This project will improve the existing road <strong>and</strong> will re-establish hardened road surfaces <strong>and</strong> drainagefeatures, including crowns, out/in slopes, ditches, water bars <strong>and</strong> culverts. These sections of road arecharacterized by poor drainage, insufficient <strong>and</strong> inappropriate road base <strong>and</strong> cap material, rutting <strong>and</strong>large erosion features, which impede access. These projects will improve access <strong>and</strong> control erosion byimproving drainage through grading, ditching, installing geotextile <strong>and</strong> fill material <strong>and</strong> confiningactivities to hardened surfaces.This project will improve the existing road <strong>and</strong> will re-establish hardened road surfaces <strong>and</strong> drainagefeatures, including crowns, out/in slopes, ditches, water bars <strong>and</strong> culverts. These sections of road arecharacterized by poor drainage, insufficient <strong>and</strong> inappropriate road base <strong>and</strong> cap material, rutting <strong>and</strong>large erosion features, which impede access. These projects will improve access <strong>and</strong> control erosion byimproving drainage through grading, ditching, installing geotextile <strong>and</strong> fill material <strong>and</strong> confiningactivities to hardened surfaces.These areas, located at Fort Richardson, Alaska, are used by troops to maintain military readiness <strong>and</strong>preparedness. Impacts from the use of the area are typical of military training exercises <strong>and</strong> include trailproliferation, vegetation damage, exposure of soil, road <strong>and</strong> trail degradation <strong>and</strong> impaired access. Theseimpacts, if left untreated, can decline <strong>and</strong> result in erosion <strong>and</strong> impaired drainage/hydrology. This projectwill mitigate training impacts by improving the health of existing vegetation through mowing, hydroaxing<strong>and</strong> fertilizing; the establishment of new vegetation in exposed area by hydro-seeding; the closingof unnecessary trails; the improvement of drainage through grading <strong>and</strong> the installation of water bars <strong>and</strong>culverts; <strong>and</strong> the reshaping <strong>and</strong> restoration of areas damaged by vehicles <strong>and</strong> equipment.This project will improve the existing road <strong>and</strong> will re-establish hardened road surfaces <strong>and</strong> drainagefeatures, including crowns, out/in slopes, ditches, water bars <strong>and</strong> culverts. These sections of road arecharacterized by poor drainage, insufficient <strong>and</strong> inappropriate road base <strong>and</strong> cap material, rutting <strong>and</strong>large erosion features, which impede access. These projects will improve access <strong>and</strong> control erosion byimproving drainage through grading, ditching, installing geotextile <strong>and</strong> fill material <strong>and</strong> confiningactivities to hardened surfaces.5Not YetDetermined2.4715.706.06Not YetDetermined12.2_____________________________________________________________________________________________Environmental AssessmentUnited States Army Alaska, <strong>Integrated</strong> <strong>Training</strong> <strong>Area</strong> <strong>Management</strong> Program<strong>Management</strong> Plan A-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!