12.07.2015 Views

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX B: Best <strong>Management</strong> PracticesAsphalt is noted as a structural material for erosion control that can be used in streamcrossings.APPENDIX D: ITAM Project Assessment ChecklistWetl<strong>and</strong> Checklist addresses an impact threshold on wetl<strong>and</strong>s that does not exist.Water Resources Checklist does not address Section 10 <strong>and</strong> Section 404 impacts towaters of the United States (waters not regulated as wetl<strong>and</strong>s).Comments on Specific Sections of the <strong>Integrated</strong> <strong>Training</strong> <strong>Area</strong> <strong>Management</strong> (ITAM) Five-Year<strong>Management</strong> Plan.4.2.7.1 Five Year Wetl<strong>and</strong>s Maneuver PermitUSARAK does not have a current five-year general wetl<strong>and</strong> permit from the Corps ofEngineers._____________________________________________________________________________________________Environmental AssessmentUnited States Army Alaska, <strong>Integrated</strong> <strong>Training</strong> <strong>Area</strong> <strong>Management</strong> Program<strong>Management</strong> Plan E-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!