12.07.2015 Views

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

Integrated Training Area Management EA and Final FNSI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VegetationYes No□ □ Could the project significantly contribute to the introduction, continued existence, orspread of noxious weeds or non-native invasive species known to occur in the area(E.O. 13112)?□ □ Will the project occur in an area where there are federally listed, endangered, orthreatened vegetation?□ □ Could impacts to vegetation resulting from this project be greater than those describedin Section 3.2, Vegetation, of the USARAK ITAM Program <strong>Management</strong> Plan <strong>EA</strong>?Wetl<strong>and</strong>sYes No□ □ Is the project located within a wetl<strong>and</strong>?□ □ Will the project involve dredging, disposal of dredged material, excavation, or filling of awetl<strong>and</strong> as described under Section 404 of the Clean Water Act?□ □ Could the project result in modifications or adverse effects to wetl<strong>and</strong>s?□ □ Could impacts to wetl<strong>and</strong>s resulting from this project be greater than those described inSection 3.3, Wetl<strong>and</strong>s, of the USARAK ITAM Program <strong>Management</strong> Plan <strong>EA</strong>?Water ResourcesYes No□ □ Is the project located within a floodplain (E.O. 11988)?□ □ Is any part of the project footprint depicted as a red area on the environmental limitationsoverlay?□ □ Will the project expose one or more acres of soil?□ □ Will the project involve discharge (or runoff) of sediment into a waterway or storm sewer?□ □ Will the project result in diversion or obstruction of stream flow?□ □ Will the project impact a wild or scenic river?□ □ Will the project involve dredging or filling of a water body as described under Section 404of the Clean Water Act?□ □ Will the project involve construction, excavation, or deposition of materials in, over, orunder a water body, or would any work affect the course, location, condition, or capacityof a water body as described under Section 10 of the Rivers <strong>and</strong> Harbors Act?□ □ Could the project result in potential impacts to surface water quality?□ □ Could impacts to waters resulting from this project be greater than those described inSection 3.4, Water Resources, of the USARAK ITAM Program <strong>Management</strong> Plan <strong>EA</strong>?Wildlife <strong>and</strong> FisheriesYes No□ □ Will the project occur in an area where there are migratory birds or federally listed,endangered, or threatened wildlife or habitat?□ □ Could the project affect the marine environment?□ □ Could impacts to wildlife <strong>and</strong> fisheries resulting from this project be greater than thosedescribed in Section 3.5, Wildlife <strong>and</strong> Fisheries, of the USARAK ITAM Program<strong>Management</strong> Plan <strong>EA</strong>?_____________________________________________________________________________________________Environmental AssessmentUnited States Army Alaska, <strong>Integrated</strong> <strong>Training</strong> <strong>Area</strong> <strong>Management</strong> Program<strong>Management</strong> Plan D-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!