12.07.2015 Views

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Standard</strong> <strong>Technical</strong> <strong>Features</strong> <strong>of</strong> <strong>BTG</strong> <strong>System</strong> <strong>for</strong> <strong>Supercritical</strong> <strong>660</strong>/800 MW Thermal Unitsd) Maximum permissible spray attemperation flow (as percentage <strong>of</strong>main steam flow at superheater/ reheater outlet)1. Superheater attemperation 8% <strong>of</strong> main steam flow atsuperheater outlet.2. Reheater attemperation 3% <strong>of</strong> steam flow at reheateroutlet (0% under normaloperating conditions).Above permissible limits shall be applicable to all boiler loads withany combination <strong>of</strong> mills in service and shall be guaranteed. TheSH/ RH attemperation system shall, however, be sized <strong>for</strong> 12% <strong>of</strong>the rated main steam flow requirement <strong>for</strong> superheater and 8% <strong>of</strong>the spray flow rated reheat flow <strong>for</strong> reheater, both at 100% BMCRload. The steam temperature downstream <strong>of</strong> desuperheater shallhave at least 10 0 C superheat to ensure proper evaporation.e) Spray water carryover Nilf) Maximum steam side header pressure unbalance 6%g) Ash bridging between the tubes NilNote: The steam generator design shall ensure that no damage is causedto the reheaters with sudden closure <strong>of</strong> turbine interceptor valve.iv) For continuous monitoring <strong>of</strong> tube metal temperatures <strong>of</strong> SH and RHelements, adequate number <strong>of</strong> thermocouples shall be provided as perstandard and proven practice <strong>of</strong> the OEM. A suggested criterion <strong>for</strong>provision <strong>of</strong> thermocouples is indicated as below:a) For supherheaters and reheaters elements placed be<strong>for</strong>e furnace exitplane (in the direction <strong>of</strong> gas flow), chromel-alumel thermocoupleson at least two elements <strong>of</strong> every fifth assembly between the twoheaders shall be provided.b) In addition to the above, adequate number <strong>of</strong> chromel-alumelthermocouples <strong>for</strong> measurement <strong>of</strong> tube metal temperatures outsidethe gas path shall also be provided. Total number <strong>of</strong> thermocouplesincluding those at (a) above shall, however, not be less than 2 (two)thermocouples per RH/SH assembly between the two headers.v) For maintenance/inspection <strong>of</strong> SH/RH:a) 1.5 m clear cavity height shall be provided between two sections/banks <strong>of</strong> horizontal heat transfer surfaces <strong>for</strong> personnel access. Forvertical surfaces, minimum clearance between the two banks shallbe 600 mm.41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!