12.07.2015 Views

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Standard</strong> <strong>Technical</strong> <strong>Features</strong> <strong>of</strong> <strong>BTG</strong> <strong>System</strong> <strong>for</strong> <strong>Supercritical</strong> <strong>660</strong>/800 MW Thermal Unitsb) Minimum transverse tube pitching in the direction <strong>of</strong> gas flow path:1. 600 mm <strong>for</strong> banks/ sections placed in areas where gastemperature exceeds the FEGT (MHVT) value.2. For bank/sections placed in areas where gas temperature exceedsIDT <strong>of</strong> ash <strong>for</strong> the range <strong>of</strong> coals specified, the minimumtransverse pitching shall be under:• For tower type boiler - 1000 mm• For two pass boiler - 762 mmc) Maximum depth <strong>of</strong> tube banks/sections in the direction <strong>of</strong> gas flowshall be 2.5 meters or maximum soot blowing radius, whichever islower.d) Supporting arrangementAll horizontal heat transfer surfaces shall be supported by steam orwater cooled hanger tubes designed <strong>for</strong> a minimum <strong>of</strong> 2 times thecalculated load so as not to cause any dislocation/ damage to the tubebanks/sections. The stress in the hanger tubes under such conditionalso shall not exceed the maximum permissible limits as per IBR.Erosion allowance <strong>of</strong> one (1) mm shall be provided over and abovethe calculated thickness <strong>of</strong> hanger tubes.e) Arrangement <strong>of</strong> headersHeaders shall be located out side the gas path and shall be fullydrainable. Wherever, locating the headers in the gas path becomesunavoidable these shall be suitably protected with erosion shields/protectors. Further, the nipples and studs <strong>of</strong> the header shall also beprovided with wear resistance stainless steel shields <strong>of</strong> minimum 2.5mm or higher thickness. The arrangement <strong>of</strong> headers shall be suchthat it does not cause the high localised flue gas velocity on tubesdown stream side <strong>of</strong> the header.f) Attemperators1. Location : At inlet or between the two SH/ RH stages.2. Construction : Made from corrosion/ erosion resistant steeland fitted with removable liners.g) Minimum tube thickness1. For leading tubes <strong>of</strong> the bank: Erosion allowance <strong>of</strong> 1.0 mm(minimum) over and above the calculated thickness as per IBRshall be provided.39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!