12.07.2015 Views

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Standard</strong> <strong>Technical</strong> <strong>Features</strong> <strong>of</strong> <strong>BTG</strong> <strong>System</strong> <strong>for</strong> <strong>Supercritical</strong> <strong>660</strong>/800 MW Thermal Unitsii) Design Temperatureiii) Design PressureMaximum fluid temperature plus margin as perIBR.1.05 times the maximum operating pressure oras required by IBR/ other international codes,whichever is higher.6.5.5 Boiler startup recirculation and drain water systemi) Boiler start-up recirculation & drain system shall be provided with startupdrain re-circulation pump and alternate drains shall be led toatmospheric flash tank or directly to turbine condenser. 2x50%condensate pumps shall be provided <strong>for</strong> pumping the atmospheric flashtank condensate to turbine condenser. Necessary control valves shall beprovided in the condensate line <strong>for</strong> maintaining the level in the flashtank/ drain receiving vessel.ii)The start-up recirculation & drain system shall comply with followingdesign requirements:a) Designed <strong>for</strong> fast start-up with and without the recirculation pumpsand cyclic load operation <strong>of</strong> Steam Generator.b) Designed <strong>for</strong> maximum possible recirculation & drain flow under allpossible normal, abnormal, upset and accidental conditions. Thedrain piping, valves, flash tank, drain receiving vessel andcondensate pumps shall also be sized to cater to this.c) Start up recirculation & drain piping and its supports shall bedesigned to take care <strong>of</strong> excessive vibration, which may result fromtwo phase flow conditions, if it occurs.d) The start-up drain re-circulation pumps shall be <strong>of</strong> proven design.Boiler start-up drain recirculation pumps and their motors shall meetthe following requirements:1. Number <strong>of</strong>pump2. Type <strong>of</strong>pump3. Motorspecification1x100% (sized <strong>for</strong> maximum flow as specifiedabove).Glandless zero leakage type with overhungimpeller.Submerged type with wet stator with watercoolers. Motor <strong>for</strong> steam generator start uprecirculation pump shall be a wet motor,specifically designed by the pump manufacturer<strong>for</strong> the application and shall be as per thestandard adopted by the pump manufacturer.Motor windings shall be <strong>of</strong> non-hygroscopicmaterial and shall be designed to withstandcontinuous water pressure & temperaturevariation.36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!