12.07.2015 Views

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Standard</strong> <strong>Technical</strong> <strong>Features</strong> <strong>of</strong> <strong>BTG</strong> <strong>System</strong> <strong>for</strong> <strong>Supercritical</strong> <strong>660</strong>/800 MW Thermal UnitsFurnace residence time shall be calculated by dividing the furnacevolume between the center line <strong>of</strong> top coal burner and furnace exitplane by the flue gas volume at mean gas temperature in the abovefurnace volume.iii) Furnace/ evaporator shall be designed <strong>for</strong> variable pressure operationover 30% to 100% BMCR load range.iv)Water/ steam walls shall be <strong>of</strong> membrane wall construction and shall bemade <strong>of</strong> seamless tubes. Furnace/ evaporator shall be <strong>for</strong>med using spiralwound/ inclined tubing or vertical plain/ rifled tubing as per the provenpractice <strong>of</strong> the manufacturer <strong>for</strong> boilers <strong>of</strong> similar capacity. Irrespective<strong>of</strong> the type <strong>of</strong> water wall tubing <strong>of</strong>fered <strong>for</strong> the evaporator, the design<strong>of</strong>fered shall ensure that no readjustment <strong>of</strong> tube mass flow is requiredduring entire operating regime <strong>of</strong> the steam generator <strong>for</strong> complete range<strong>of</strong> specified coals. In case such readjustment becomes necessary over aperiod <strong>of</strong> five years from the date <strong>of</strong> successful completion <strong>of</strong> initialoperation <strong>of</strong> respective steam generator, the same shall be carried out bythe supplier. Appropriate time required <strong>for</strong> readjustment and period <strong>of</strong>shut down shall be indicated.v) Elevation <strong>of</strong> Furnace Bottom Hopper shall be at least 10.25 m abovegrade level <strong>for</strong> wet bottom ash handling system and opening <strong>of</strong> bottomhopper shall be 1.10 m (minimum) wide.vi) A minimum allowance <strong>of</strong> 0.6 mm over and above the calculatedthickness as per IBR shall be provided <strong>for</strong> entire water wall. Anadditional tube thickness <strong>of</strong> 1.0 mm over and above the tube thickness <strong>of</strong>water wall tubes calculated as per above shall be provided on all waterwall tubes coming within a radius <strong>of</strong> one meter around each wall blowerto guard against premature tube failure due to soot blowing steamerosion.vii) Flame impingement on steam/ water walls is not permitted.viii) Maximum allowable tube skin temperature <strong>for</strong> evaporator section shallbe 40 0 C below oxidation limit <strong>for</strong> tube metal.ix) Headers shall be located external to gas path and shall be completelydrainable. If locating headers in gas path becomes unavoidable, thensuitable erosion shields/ protectors must be provided.x) Minimum 10 mm dia. wear bars <strong>of</strong> suitable wear resistant material shallbe welded along the full length <strong>of</strong> first 40 tubes <strong>of</strong> inclined water walltubes <strong>of</strong> S-panel <strong>of</strong> bottom hopper from each corner up to hopperopening or adequate additional thickness shall be provided to take care<strong>of</strong> erosion.34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!