Standard Technical Features of BTG System for Supercritical 660 ...
Standard Technical Features of BTG System for Supercritical 660 ... Standard Technical Features of BTG System for Supercritical 660 ...
Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Units5.1 General RequirementsCHAPTER 5PERFORMANCE GUARANTEES5.1.1 The equipment shall meet the ratings and performance requirements stipulatedfor various equipment. The guaranteed performance parameters shall bewithout any tolerance values and all margins required for instrumentinaccuracies and other uncertainties shall be deemed to have been included inthe guaranteed figures.5.1.2 All the guarantees shall be demonstrated during functional guarantee/acceptance test. The various tests which are to be carried out duringperformance guarantee/acceptance test are listed in this chapter. The guaranteetests shall be conducted at site on each unit individually.5.1.3 All instruments required for performance testing shall be of the type andaccuracy required by the code(s) and prior to the test these shall be calibratedin an independent test Institute. The protecting tubes, pressure connections andother test connections required for conducting guarantee test shall conform tothe relevant codes.5.1.4 Detailed Performance Test Procedure to be furnished shall contain thefollowing:i) Object of the test.ii) Various guaranteed parameters & tests as per contract.iii) Method of conductance of test and test code.iv) Duration of test, frequency of readings & number of test runs.v) Method of performance calculation.vi) Correction curves.vii) Instrument list consisting of range, accuracy, least count, and location ofinstruments.viii) Scheme showing measurement points.ix) Sample calculation.x) Acceptance criteria.xi) Any other information required for conducting the test.5.1.5 In case during performance guarantee test(s) it is found that theequipment/system has failed to meet the guarantees, all necessarymodifications and/or replacements shall be carried out to make theequipment/system comply with the guaranteed requirements & the same shallbe demonstrated by conducting another performance guarantee test at no extracost to the purchaser. However, if the contractor is not able to demonstrate the12
Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Unitsguarantees, even after the above modifications/ replacements within ninety(90) days or a reasonable period allowed by the purchaser, after the tests havebeen completed, the purchaser will have the right to either of the following:i) For Category-I GuaranteesReject the equipment/ system/ plant and recover the payment alreadymadeORAccept the equipment/ system/ plant after levying Liquidated Damagesas stipulated. (Amount of LD to be specified by the purchaser based onunit size, coal cost etc.)ii)For Category-II GuaranteesReject the equipment/ system/ plant and recover the payment alreadymade. Conformance to the performance requirements under Category-IIis mandatory.iii)For Category-III GuaranteesReject the equipment/ system/ plant and recover the payment alreadymade.ORAccept the equipment/ system after assessing the deficiency in respect ofthe various ratings, performance parameters and capabilities and recoveramount equivalent to the damages.5.2 Guarantees Under Category-IThe performance guarantees which attract liquidated damages are as follows:5.2.1 Efficiency of the steam generator at 100% TMCR with zero make up whilefiring the design coal at rated steam parameters, rated coal fineness and ratedexcess air.5.2.2 Efficiency of the steam generator at 80% TMCR with zero make up whilefiring the design coal at rated steam parameters, rated coal fineness and ratedexcess air (for reference).5.2.3 Steam generating capacity in T/hr. of steam at rated steam parameters atsuperheater outlet and rated steam temperature at reheater outlet (with anycombination of mills working as per purchaser’s discretion) with the coalbeing fired from within the range specified.5.2.4 Turbine Cycle Heat Rate in kcal/kWh under rated steam conditions, designcondenser pressure with zero make up at 100% TMCR load.13
- Page 1 and 2: STANDARD TECHNICAL FEATURESOFBTG SY
- Page 5 and 6: Standard Technical Features of BTG
- Page 7 and 8: Standard Technical Features of BTG
- Page 9 and 10: Standard Technical Features of BTG
- Page 11 and 12: Standard Technical Features of BTG
- Page 13 and 14: Standard Technical Features of BTG
- Page 15 and 16: Standard Technical Features of BTG
- Page 17 and 18: Standard Technical Features of BTG
- Page 19 and 20: Standard Technical Features of BTG
- Page 21: Standard Technical Features of BTG
- Page 25 and 26: Standard Technical Features of BTG
- Page 27 and 28: Standard Technical Features of BTG
- Page 29 and 30: Standard Technical Features of BTG
- Page 31 and 32: Standard Technical Features of BTG
- Page 33 and 34: Standard Technical Features of BTG
- Page 35 and 36: Standard Technical Features of BTG
- Page 37 and 38: Standard Technical Features of BTG
- Page 39 and 40: Standard Technical Features of BTG
- Page 41 and 42: Standard Technical Features of BTG
- Page 43 and 44: Standard Technical Features of BTG
- Page 45 and 46: Standard Technical Features of BTG
- Page 47 and 48: Standard Technical Features of BTG
- Page 49 and 50: Standard Technical Features of BTG
- Page 51 and 52: Standard Technical Features of BTG
- Page 53 and 54: Standard Technical Features of BTG
- Page 55 and 56: Standard Technical Features of BTG
- Page 57 and 58: Standard Technical Features of BTG
- Page 59 and 60: Standard Technical Features of BTG
- Page 61 and 62: Standard Technical Features of BTG
- Page 63 and 64: Standard Technical Features of BTG
- Page 65 and 66: Standard Technical Features of BTG
- Page 67 and 68: Standard Technical Features of BTG
- Page 69 and 70: Standard Technical Features of BTG
- Page 71 and 72: Standard Technical Features of BTG
<strong>Standard</strong> <strong>Technical</strong> <strong>Features</strong> <strong>of</strong> <strong>BTG</strong> <strong>System</strong> <strong>for</strong> <strong>Supercritical</strong> <strong>660</strong>/800 MW Thermal Unitsguarantees, even after the above modifications/ replacements within ninety(90) days or a reasonable period allowed by the purchaser, after the tests havebeen completed, the purchaser will have the right to either <strong>of</strong> the following:i) For Category-I GuaranteesReject the equipment/ system/ plant and recover the payment alreadymadeORAccept the equipment/ system/ plant after levying Liquidated Damagesas stipulated. (Amount <strong>of</strong> LD to be specified by the purchaser based onunit size, coal cost etc.)ii)For Category-II GuaranteesReject the equipment/ system/ plant and recover the payment alreadymade. Con<strong>for</strong>mance to the per<strong>for</strong>mance requirements under Category-IIis mandatory.iii)For Category-III GuaranteesReject the equipment/ system/ plant and recover the payment alreadymade.ORAccept the equipment/ system after assessing the deficiency in respect <strong>of</strong>the various ratings, per<strong>for</strong>mance parameters and capabilities and recoveramount equivalent to the damages.5.2 Guarantees Under Category-IThe per<strong>for</strong>mance guarantees which attract liquidated damages are as follows:5.2.1 Efficiency <strong>of</strong> the steam generator at 100% TMCR with zero make up whilefiring the design coal at rated steam parameters, rated coal fineness and ratedexcess air.5.2.2 Efficiency <strong>of</strong> the steam generator at 80% TMCR with zero make up whilefiring the design coal at rated steam parameters, rated coal fineness and ratedexcess air (<strong>for</strong> reference).5.2.3 Steam generating capacity in T/hr. <strong>of</strong> steam at rated steam parameters atsuperheater outlet and rated steam temperature at reheater outlet (with anycombination <strong>of</strong> mills working as per purchaser’s discretion) with the coalbeing fired from within the range specified.5.2.4 Turbine Cycle Heat Rate in kcal/kWh under rated steam conditions, designcondenser pressure with zero make up at 100% TMCR load.13