12.07.2015 Views

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Standard</strong> <strong>Technical</strong> <strong>Features</strong> <strong>of</strong> <strong>BTG</strong> <strong>System</strong> <strong>for</strong> <strong>Supercritical</strong> <strong>660</strong>/800 MW Thermal Units5.1 General RequirementsCHAPTER 5PERFORMANCE GUARANTEES5.1.1 The equipment shall meet the ratings and per<strong>for</strong>mance requirements stipulated<strong>for</strong> various equipment. The guaranteed per<strong>for</strong>mance parameters shall bewithout any tolerance values and all margins required <strong>for</strong> instrumentinaccuracies and other uncertainties shall be deemed to have been included inthe guaranteed figures.5.1.2 All the guarantees shall be demonstrated during functional guarantee/acceptance test. The various tests which are to be carried out duringper<strong>for</strong>mance guarantee/acceptance test are listed in this chapter. The guaranteetests shall be conducted at site on each unit individually.5.1.3 All instruments required <strong>for</strong> per<strong>for</strong>mance testing shall be <strong>of</strong> the type andaccuracy required by the code(s) and prior to the test these shall be calibratedin an independent test Institute. The protecting tubes, pressure connections andother test connections required <strong>for</strong> conducting guarantee test shall con<strong>for</strong>m tothe relevant codes.5.1.4 Detailed Per<strong>for</strong>mance Test Procedure to be furnished shall contain thefollowing:i) Object <strong>of</strong> the test.ii) Various guaranteed parameters & tests as per contract.iii) Method <strong>of</strong> conductance <strong>of</strong> test and test code.iv) Duration <strong>of</strong> test, frequency <strong>of</strong> readings & number <strong>of</strong> test runs.v) Method <strong>of</strong> per<strong>for</strong>mance calculation.vi) Correction curves.vii) Instrument list consisting <strong>of</strong> range, accuracy, least count, and location <strong>of</strong>instruments.viii) Scheme showing measurement points.ix) Sample calculation.x) Acceptance criteria.xi) Any other in<strong>for</strong>mation required <strong>for</strong> conducting the test.5.1.5 In case during per<strong>for</strong>mance guarantee test(s) it is found that theequipment/system has failed to meet the guarantees, all necessarymodifications and/or replacements shall be carried out to make theequipment/system comply with the guaranteed requirements & the same shallbe demonstrated by conducting another per<strong>for</strong>mance guarantee test at no extracost to the purchaser. However, if the contractor is not able to demonstrate the12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!