12.07.2015 Views

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Standard</strong> <strong>Technical</strong> <strong>Features</strong> <strong>of</strong> <strong>BTG</strong> <strong>System</strong> <strong>for</strong> <strong>Supercritical</strong> <strong>660</strong>/800 MW Thermal UnitsCHAPTER- 22.CONDENSATE POLISHING PLANT22.1 GeneralThe Condensate polishing Plant shall consist <strong>of</strong> one set <strong>of</strong> Condensatepolishing Units (CPU) <strong>for</strong> each TG unit and a common external regenerationsystem. The CPU <strong>for</strong> each <strong>660</strong> MW unit shall consist <strong>of</strong> 3x50% capacityservice vessels (4x33.3% <strong>for</strong> 800 MW unit size).22.2 Salient Design Datai) The design flow (through working vessels) <strong>for</strong> each condensate polishingunit shall be as per condensate flow corresponding to TG output atVWO with 1% make up and design condenser pressure.ii)The following dissolved solids concentration and conditions shall beused as a basis <strong>of</strong> design <strong>for</strong> the condensate polishing system (the ionicconcentrations indicated below are as such):Description Influent Effluenta) Ammonia ppb 100 --b) Total dissolved solids (excluding100 20ammonia), ppbc) Silica, ppb 30 5d) Iron, ppb 50 5e) Sodium, ppb 10 2f) Chloride, ppb 10 2g) pH 8 – 9.3 --h) Effluent conductivity after removal -- 0.1 or less<strong>of</strong> ammonia and amines (micromhos/cm) at 25 0 C.i) Suspended solids (crud), ppb 25 5Under the above operating and design flow through the polisher units,the service run <strong>of</strong> the vessels shall be minimum 15 days (360 hrs). Themode <strong>of</strong> CPU operation during this period shall be either in hydrogencycle or a combination <strong>of</strong> hydrogen and ammonia cycle maintaining theabove effluent quality. Whenever specific conductivity starts increasingfrom 0.1 micro mhos/cm in the effluent, it shall deemed that “ammoniabreak point” has reached and ammonia cycle has commenced.194

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!