12.07.2015 Views

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

Standard Technical Features of BTG System for Supercritical 660 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Standard</strong> <strong>Technical</strong> <strong>Features</strong> <strong>of</strong> <strong>BTG</strong> <strong>System</strong> <strong>for</strong> <strong>Supercritical</strong> <strong>660</strong>/800 MW Thermal UnitsCHAPTER - 2OPERATING CAPABILITY OF PLANT2.1 The plant shall be designed to operate as a base load station and shall have adesign life <strong>of</strong> minimum twenty five (25) years. However, continuous operationunder two shift and cyclic modes during certain periods is also envisaged. Thedesign <strong>of</strong> the plant equipment and control system would permit participation<strong>of</strong> the plant in automatic load frequency control. The major operatingcapabilities <strong>for</strong> the unit(s)/ plant are envisaged as under:2.1.1 Operate continuously with turbine under VWO condition with rated steamparameters, specified rated condenser pressure and 1% cycle make up.2.1.2 Sliding pressure/ modified sliding pressure operation from rated load down to40% <strong>of</strong> rated load. The modified sliding pressure operation shall comprise <strong>of</strong>constant pressure operation from rated load to approximately 90% <strong>of</strong> ratedload and then sliding pressure operation down to 40% <strong>of</strong> rated load. At anyoperating load upto 100% rated load, the turbine shall be capable to achieve aninstantaneous increase in turbine output by 5% <strong>of</strong> the corresponding load, byopening turbine control valves/ overload valves wide open.2.1.3 The plant shall have adequate provision <strong>for</strong> quick start-up and loading <strong>of</strong> theunits to full load at a fast rate.2.1.4 Operate continuously with all HP heaters out <strong>of</strong> service with maximumspecified cooling water temperature, 1% cycle make up and normal auxiliarysteam requirement being tapped from cold reheat line, to generate maximumoutput without over stressing turbine components. The power output <strong>of</strong> theunit under this operating condition shall not be less than the rated output (<strong>660</strong>or 800 MW, as applicable).2.1.5 In case <strong>of</strong> sudden reduction in demand (load throw <strong>of</strong>f), the unit should getsafely unloaded and stabilized <strong>for</strong> operation at house load with HP- LP bypassopen to required capacity.2.1.6 Operate continuously at rated output (<strong>660</strong> or 800 MW, as applicable) underrated steam conditions, specified worst condenser pressure, 1% cycle make-upand 47.5 Hz grid frequency.2.1.7 The design <strong>of</strong> the plant equipment and control system would permitparticipation <strong>of</strong> the plant in automatic load frequency control.2.2 Steam generator, turbine generator and auxiliaries shall be designed to cater tothe above operating conditions with adequate margin as per standard practiceprevailing in the fossil fired power plants.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!