12.07.2015 Views

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

375 Schedule HThe drawing mentioned in the Schedule H is notenclosed along with the Bid documents. Pl. providethe same376 Part IV & Part Part IV - Electronic WorksPart V - Computer , Hardware , Networking &Software WorksAuthority (MPRDC) should provide freedom to "Concessionaire" to design the solution on technicalrequirement as per RFP/Concession Agreement forDevelopment on <strong>24</strong> Border Check Post377 Cl.No-2 Schedule R Part-IV2. Loading-Unloading Charges: Rs.<strong>24</strong>0 per ton. Thisrate will be increase @ 5% per year and roundedoff nearest to Rs. 10.00.We presume that the charges Rs. <strong>24</strong>0 per ton areseparate for loading and unloading respectively. Pl.clarify378 Cl.No-5.1.4 Article-5 Part-III: (d) apply for andobtain all necessary clearance and /or approval for theconstruction of Check Posts from NHAI, MoRTH,State PWD or any other competent authorities. TheConcessionaire shall obtain the various statutorypermissions such as sanction of plan and estimatesincluding electrification and installation of electronicand electrical equipments, separate transformer, ifrequired from Competent Authority, external electricconnections from MPSEB or any other competentauthority water supply and sanitary arrangement,internal roads, landscaping, street lights, storm waterAnnexedNo changeAlready clarified.Already clarified.88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!