12.07.2015 Views

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

291 What other business processes and interfaces arerequired apart from Lane/Toll business292 Toll charges will be decided based on the manualverification of the image captured by the camera.Needs confirmationQuery not clear. Detailed requirement already given andclarifiedUser fee is based on category of vehicles293 What will be the feature required on Web portal? Concessionaire needs to assess on its own based on thefunctional & technical requirements of user departmentand as augmented from time to time. It will be a part ofsystem requirement study to be done by Concessionaire294 What is the scope of the inventory system at Checkpost?295 There are 2 data centres. Are they both required to bein sync or is one of then a Disaster Recovery setup?Please clarify this.296 Schedule D; Part V; Section 5(i)Please quantify the Response Time and ThroughputOf Information?Provision and requirement are clear. No change297 Where is the work location for HW resources? At Check Posts and CCFYes. both has to be individually complete centers asdifferent department will be monitoring from two placeConcessionaire to assess for on line web basedapplication viz-a-viz expected load.298 “System and Application software based on theSystem application study”, do we have this Studyreport or expect us to do initial study and then designsoftware.Concessionaire to study and then design software.299 It talks about application ability to interface with Integration needs to be done as and when required72

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!