12.07.2015 Views

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The L2 switch should have 802.1q, VLAN Group-4k,GVRP support, Dynamic VLAN group 200Kindly modify the clause to support the line rate ofthe switch.Vol.4 Section D 1.6.3 Technical specification ofmanaged Layer 2 POE switch RE: serial no:1The L2 switch should have 8 priority queues with Cosbased on on MAC DA/SA, 803.1p priority,TOS/DSCP, protocol type, IPV4 DA/SA TCp/UDPport.The L2 Switch should have 8 priority queues withCos based on 802.1p priority, TOS/DSCP, protocoltype, IPV4 DA/SA TCp/UDP port.Vol.4 Section D 1.6.2 Technical specification ofmanaged Layer 2 POE switch RE: serial no:7Safeguard EngineKindly remove this clause to accommodate otherOEM for better competition225 Vol.4 Section D 1.6.3 Technical specification ofmanaged Layer 2 Gigabit POE switch RE: serial no:1The L2 Management switch should have <strong>24</strong> port POE10/100/1000 base - Tx + 4 combo SFP portsspecification of Managed Layer 2 POE switch , theclause stand amended by -Annexure VSchedule D Part V - Computer , hardware, networkingand software works – Clause 1.6.3 Minimum Technicalspecification of Layer 2 Gigabit POE switch standamended by - Annexure VI.Schedule D Part V - Computer , hardware, networkingand software works – Clause 1.6.2 Minimum Technicalspecification of Managed Layer 2 POE switch , theclause stand amended by -Annexure VSchedule D Part V - Computer , hardware, networkingand software works – Clause 1.6.3 Minimum Technicalspecification of Layer 2 Gigabit POE switch standKindly modify the clause to “The L2 management amended by - Annexure VIswitch should have <strong>24</strong> ports POE 10/100/1000BaseTx + 4 SFP port” to allow other vendors to participateto have healthy competition.226 Vol.4 Section D 1.6.3 Technical specification of Schedule D Part V - Computer , hardware, networking54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!