MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

113 Schedule C Table C-1At least 30% area shall be increased for FacilityCentre, to accommodate more facilities.114 Schedule D – Section 4 Para 4.4.2 (v)The construction of Rigid Pavement should be doneby Slip-form Paver.Request to allow paving of Rigid pavement by usingfixed form OR by Slip -form Paver method.115 Schedule D – Section 9 Para 9.4Operator BoothsPlease provide typical sitting arrangement of staff ofvarious Government Departments within Booth area.116 Schedule GDefinition of Central Control Room, as stated inSchedule G milestone III, is not provided. Is it thesame as Central Control facility?117 Schedule K Para 1.2During the Construction Period the Concessionaireshall take appropriate measures to operate andmaintain the existing road and ensure foruninterrupted, smooth and safe traffic flow at alltimes.Concessionaire may do so at his own costFor construction of rigid pavement relevant provisionsin Schedule „D‟ is amended to the extent that Fix FormPaver can be used in place of Slip Form Paver.Conceptual drawing is provided. Working drawings areto be prepared by Concessionaire.YesAlready clarifiedIt shall apply only to the project site i.e. the CheckPost Area. If in any case, the highway is in operationunder BOT scheme (where the concessionaire has to28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!