12.07.2015 Views

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

MINUTES OF THE PRE-BID MEETING HELD ON 09.08.2010for 24 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

used after the check post is build up.103 For gantry signs at 1500m and 750m from the checkpost it has been mentioned that it should cover theexisting formation width of the highway. But varioushighways have been proposed to be widened in nearfuture, So who will bear the expense of widening thegantry at later stage.104 Details of existing equipment at various check postshould be provided.105 Whether existing equipment will be handed over toconcessionaire or it will be property of MPRDC106 Whether existing pipe, slab culvert is to be widened orit should be dismantled and reconstructed as boxculvert.107 Schedule B Para 6.2 – Table B-11Sr. No. 7 - Scanners good scanningKindly confirm the no. of Scanners for goods scanningto be provided at all the Large check post or Only atSingle108 Schedule B, Clause 6.2 – Other EquipmentsThen total equipments at large check post for the itemno. 7 i.e. Scanner for goods scanning should be 4instead 1 as mentioned therein, kindly check.109 Schedule B, Para 9.0Human ResourceManpower required for Service Fees collection forConcessionary are to be deployed in addition tomanpower mentioned in Para 9.1 & 9.2ConcessionaireConcessionaire to make its own assessmentAlready clarified.Depending upon site condition if required it may bereconstructed as per Schedule „D‟Only one mobile scanner is to be provided.Already clarifiedYes. Such manpower is to be engaged and paid for byConcessionaire.26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!