or any other tax exemption is applicable to this project. Please confirm61 It is mentioned at Para 2 of Schedule R : Loading –Unloading charges Rs. <strong>24</strong>0 per tonne. It is presumedthat concessionaire shall be payable Rs. <strong>24</strong>0 per tonnefor loading & Rs. <strong>24</strong>0 per tonne for unloadingseparately. Please clarify62 ROW & Lane Area (it is mentioned as per Cl. 4.2.1 ofSchedule B that Lane area is rigid pavement) has beengiven as same. Lane area (all with rigid pavement) seems to beon higher side.63 Also please clarify that Detention Area, Parking Area &conopy are part of Lane Area or in addition/exclusive tolane area.64 Please confirm: MPRDC shall handover concessionaire thecomplete encumbrance free RoW, with all utilityshifting done, at all <strong>24</strong> check posts beforesigning of Concession Agreement.65 Please provide the year when the project cost wasestimated.66 It is mentioned in Cl.2.0, Schedule C, CA thatconcessionaire has to construct Project Facilities likeDhabas/Eateries, Puncture & Tyre Repair, GeneralMerchandising, Medical shop/dispensary, STD/PCO/Cyber café, Auto Mechanic & Auto Spare shop, 250 sq.ftr. Room.relevant tax authorities.Yes, it will be paid by those who are willing to takethe assistance of the Concessionaire for loading/unloading.Lane area for each side in table B-5 is modified asgiven in point No. 13. It is clarified that lane areashall be in rigid pavement. Detention area, Parkingarea and Administrative Building area can be inflexible pavement and is to be designed as perSchedule „D‟.Detention area and parking area are exclusive in lanearea but canopy area is included in Lane area. Pleaserefer drawing in Schedule „H‟.Utility shifting is to be done by the Concessionaire.The cost has been estimated by MPRDC in 2009-10.However, the Concessionaire is required to make itsown estimates for the same.Yes14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!