12.07.2015 Views

The Weiler Engineering Corporation 6805 ... - KeyWestCity.com

The Weiler Engineering Corporation 6805 ... - KeyWestCity.com

The Weiler Engineering Corporation 6805 ... - KeyWestCity.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A. Company ProfileWEC also prioritizes providing a positive impact for the local economy. Basedon our assistance with bid documents, value engineering and re<strong>com</strong>mendations,we devised a plan to divide the City of Marathon sewer project intosmaller sub‐phases of approximately $2 Million or less. <strong>The</strong>se small phasesallowed the use of smaller local <strong>com</strong>panies who were able to bond the necessaryamounts for construction and submit <strong>com</strong>petitive bids. As a result, forone of the projects, total construction cost bids were half of the original twobids. By saving the City $100 Million, they were able to add a city‐wide stormwatersystem for a total cost of less than the original sanitary sewer budget.<strong>Weiler</strong> <strong>Engineering</strong> Areas of Expertise:• LAP Design and Construction Administration• Road Design, Permitting and Inspection• Multi‐Use Trail Design, Permitting and Inspection• Utility Design, permitting and Inspection• Lift Station Design and Rehabilitation• Pump Station Design and Permitting• Vacuum Station Design and Permitting• Gravity, Low Pressure, Vacuum Collection System Designand Permitting• Wastewater Treatment Plant Design & Expansion• Marina Construction <strong>Engineering</strong> and Inspection• Site Development Construction <strong>Engineering</strong> and Inspection• Maintenance of Traffic Design and Inspection• Bridge Inspection and Design• GPS Data Collection, GIS Data Input• Asset Management Systems• Structural <strong>Engineering</strong>• Site Design• Environmental Monitoring• Wetland Mitigation• Cost Estimation• Bidding Assistance• Change Order Evaluation• Pay Application Evaluation• Value <strong>Engineering</strong>• Public Relations and Outreach• Drafting of local design and permitting requirements• Developing Technical Specifications• FDOT Design Standards• Erosion and Sediment Control Measures• Stormwater Modeling• State and Federal Grant Funding Assistance• Local government permit Submittal Review• Federal and State <strong>com</strong>pliance review and permittingConstruction <strong>Engineering</strong> and InspectionTypical Services:• Resident Project Representative (RPR)• Bidding assistance, preparation of RFP, RFQ, Instructions toBidders, Contract Documents, evaluation of bids, rankingof proposals, contract negotiations,• Submittal Review – Shop drawings, CPM schedule, scheduleof values, proposed submittal log, pre‐constructionvideo, and MOT plans.• Daily Inspections and Observation of Construction• Producing work directives, change orders, responses toRFIs• Daily GPS Field Work – Daily GPS shots and photographsfor each system <strong>com</strong>ponent (asset inventory).• Weekly Pay Quantities Summary and Report• Monthly Progress Payments – Verify quantities claimed,reconcile daily and weekly tallies, check for correctness ofcontractors’ applications for payment.• Redline Review – In conjunction with progress payments,the contractor’s redline record drawings are reviewed andspot verification is performed and <strong>com</strong>pared against inspectorlogs and the construction management GIS database.• Final Walkthrough and Punch List• Retainage Reduction• Substantial Completion— In fast track construction projects,these are often <strong>com</strong>pleted by phases• Participation in testing and start‐up for the collection system,pump stations, and wastewater treatment plants.• Operation and Maintenance (O&M) Documentation• Preparation of Record Drawings, Record Documentation• Final CompletionRFQ #12‐005City of Key West — General <strong>Engineering</strong> ServicesPage 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!