12.07.2015 Views

The Weiler Engineering Corporation 6805 ... - KeyWestCity.com

The Weiler Engineering Corporation 6805 ... - KeyWestCity.com

The Weiler Engineering Corporation 6805 ... - KeyWestCity.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

C. Experience—UtilitiesUtility <strong>Engineering</strong>Key West Resort Utilities, Key West, FLWEC has served as a General Consultant to KW ResortUtility since 2003 and provided engineering servicesto the Utility since 1999. WEC worked with the Utilityin development of Annual Capacity Analysis Reports,Reclaimed Water Protocol, Capital ImprovementsPlans, annual operation and maintenance budget re<strong>com</strong>mendations,and numerous engineering services.<strong>Engineering</strong> services have included design, permittingand construction contract administration to doublecapacity of the facility and convert to meet advancedwastewater treatment standards, and assisting Utilitystaff to <strong>com</strong>plete design, permitting and providingconstruction administration to construct a newsewer collection system to serve South Stock Island. <strong>The</strong> project included more than twenty miles of sewercollection and transmission mains, multiple lift stations, and public access reuse facilities.WEC was the sole Engineer working on this project. WECworked with Utility staff on a number of project phases andscopes. During the expansion of the collection system, WECwas responsible for design, permitting, and constructionadministration. <strong>The</strong> collection system was <strong>com</strong>pleted early,within 8 months. <strong>The</strong> time allotted for construction was 12months. Budgeted amount was $4.5 Million and project was<strong>com</strong>pleted for $3.9M. No change orders were required.Many engineering services for the KW Resort Utility wereac<strong>com</strong>plished under the guidance of Mr. <strong>Weiler</strong>. <strong>The</strong>se servicesinclude submitting permit renewal applications, writinga reclaimed water reuse protocol, review of plans submittedby developers, and construction inspection on behalf of the Utility for developments in the servicearea. Included in these projects were the connection of the Key West Botanical Gardens and the Florida KeysSPCA wastewater systems to the KW Resort Utility wastewater facility. Other recent projects include replacementof 4,000 feet of reclaimed water force main and the abandonment of three (3) effluent disposal wells.Each project was <strong>com</strong>pleted within budget and on schedule. Under Mr. <strong>Weiler</strong>’s responsible charge WEC hasprovided a range of construction services including full construction inspection and engineering for a lowpressure collection system at the Sunset Trailer Park.Mr. Castle was project manager for much of the collection system design and construction administration.One example of a recent project was to connect the Monroe County Detention Center, the Key West BotanicalGardens and the Florida Keys SPCA wastewater systems to the KW Resort Utility wastewater facility. Otherrecent projects include replacement of 4,000 feet of reclaimed water force main, the abandonment of threeeffluent disposal wells and numerous upgrades and expansions to the wastewater treatment plant includingthe conversion to Advanced Wastewater Treatment Standards and design of its reclaimed water pumping andRFQ #12‐005City of Key West — General <strong>Engineering</strong> ServicesPage 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!