01.12.2012 Views

Specification Balance Group Acceptance Test - Swissgrid

Specification Balance Group Acceptance Test - Swissgrid

Specification Balance Group Acceptance Test - Swissgrid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.2 Formal test for TPS schedule messages<br />

4.2.1 Day-ahead, formal test, external and internal trade, unlimited capacity<br />

Scenario: 1a – Standard BG<br />

Execution: for new registered BG obligatory<br />

Purpose: Day-ahead, formal test, external and internal trade, unlimited capacity<br />

Timing: D-1 before 14:30<br />

# System Under <strong>Test</strong> KEMA <strong>Test</strong> System<br />

1 BGR sends a TPS:<br />

� Day-ahead (process type A01)<br />

� At least 1 time series with external trade,<br />

unlimited capacity (business type A06)<br />

� At least 1 time series with internal trade<br />

(business type A02)<br />

� Sender EIC code of standard BG<br />

2 For formally correct TPS:<br />

Sends a positive ACK message<br />

Note:<br />

� Reason code A01<br />

swissgrid ag | Dammstrasse 3 | P.O. Box 22 | CH-5070 Frick | Phone +41 58 580 21 11 | Fax +41 58 580 21 21 | www.swissgrid.ch<br />

Page 8 of 21<br />

� The schedule message and schedule time series must have the same version number (this is verified by<br />

the ESS formal test platform).<br />

� Day-ahead schedule message must be drawn up for the next day (tomorrow)<br />

� There may not be any other business types specified except A02 and A06<br />

V 3.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!