01.12.2012 Views

Specification Balance Group Acceptance Test - Swissgrid

Specification Balance Group Acceptance Test - Swissgrid

Specification Balance Group Acceptance Test - Swissgrid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.1.2 Status Request<br />

swissgrid ag | Dammstrasse 3 | P.O. Box 22 | CH-5070 Frick | Phone +41 58 580 21 11 | Fax +41 58 580 21 21 | www.swissgrid.ch<br />

Page 7 of 21<br />

The Status Request is independent of the used ESS version. But a BGR who is using ESS v2r3 gets back<br />

the requested information in ESS v2r3 format.<br />

ESR 2.0<br />

Message DtdVersion DtdRelease Style sheet-reference<br />

StatusRequest 2 0<br />

4.1.3 Applied Formal <strong>Test</strong>s<br />

<br />

� Unless otherwise specified, the TPS schedule messages in the test scenarios are tested for the following:<br />

� Correctness of the XML message according to ESS V2R3<br />

o Standardized XML reference to DTD (as mentioned in the previous paragraph) for ESS v2r3<br />

messages.<br />

� Compliance with the Technical <strong>Balance</strong> <strong>Group</strong> Requirements (including file name)<br />

� Day-ahead, intra-day and post scheduling adjustment notification times<br />

� EIC codes (plausibility)<br />

� Terms:<br />

� D: Schedule day<br />

� Other terms: See VSE document «Glossary for the rules governing the Swiss electricity market»<br />

V 3.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!