Specification Balance Group Acceptance Test - Swissgrid
Specification Balance Group Acceptance Test - Swissgrid
Specification Balance Group Acceptance Test - Swissgrid
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4.1.2 Status Request<br />
swissgrid ag | Dammstrasse 3 | P.O. Box 22 | CH-5070 Frick | Phone +41 58 580 21 11 | Fax +41 58 580 21 21 | www.swissgrid.ch<br />
Page 7 of 21<br />
The Status Request is independent of the used ESS version. But a BGR who is using ESS v2r3 gets back<br />
the requested information in ESS v2r3 format.<br />
ESR 2.0<br />
Message DtdVersion DtdRelease Style sheet-reference<br />
StatusRequest 2 0<br />
4.1.3 Applied Formal <strong>Test</strong>s<br />
<br />
� Unless otherwise specified, the TPS schedule messages in the test scenarios are tested for the following:<br />
� Correctness of the XML message according to ESS V2R3<br />
o Standardized XML reference to DTD (as mentioned in the previous paragraph) for ESS v2r3<br />
messages.<br />
� Compliance with the Technical <strong>Balance</strong> <strong>Group</strong> Requirements (including file name)<br />
� Day-ahead, intra-day and post scheduling adjustment notification times<br />
� EIC codes (plausibility)<br />
� Terms:<br />
� D: Schedule day<br />
� Other terms: See VSE document «Glossary for the rules governing the Swiss electricity market»<br />
V 3.7