01.12.2012 Views

Specification Balance Group Acceptance Test - Swissgrid

Specification Balance Group Acceptance Test - Swissgrid

Specification Balance Group Acceptance Test - Swissgrid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contents<br />

swissgrid ag | Dammstrasse 3 | P.O. Box 22 | CH-5070 Frick | Phone +41 58 580 21 11 | Fax +41 58 580 21 21 | www.swissgrid.ch<br />

Page 4 of 21<br />

1 Introduction 5<br />

2 Reference documents 5<br />

3 <strong>Test</strong> procedure 5<br />

4 ESS formal and process management (schedule operation): 6<br />

4.1 Description of the test scenarios 6<br />

4.1.1 Messages using ESS v2r3 6<br />

4.1.2 Status Request 7<br />

4.1.3 Applied Formal <strong>Test</strong>s 7<br />

4.2 Formal test for TPS schedule messages 8<br />

4.2.1 Day-ahead, formal test, external and internal trade, unlimited capacity 8<br />

4.2.2 Intra-day, formal test, external trade, unlimited capacity 9<br />

4.2.3 Post scheduling adjustment; formal test, internal trade 10<br />

4.3 Matching process intraday 11<br />

4.3.1 Matching process intraday (Internal Trade) 11<br />

4.3.2 Matching process intraday (External Trade) 12<br />

4.4 Intra-day timing (Internal Trade) 12<br />

4.5 Post scheduling adjustment 14<br />

4.6 Imposed time series procedure 14<br />

4.7 Schedule message across auctioned border 15<br />

4.8 Single sided schedule procedure 17<br />

5 Optional <strong>Test</strong>s 18<br />

5.1 Status Request procedure 18<br />

6 Communication and configuration tests (schedule operation) 20<br />

6.1 General 20<br />

6.2 Communication and configuration testing of the e-mail connection 20<br />

6.3 Communication test of FTP link 21<br />

V 3.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!