Specification Balance Group Acceptance Test - Swissgrid
Specification Balance Group Acceptance Test - Swissgrid
Specification Balance Group Acceptance Test - Swissgrid
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Contents<br />
swissgrid ag | Dammstrasse 3 | P.O. Box 22 | CH-5070 Frick | Phone +41 58 580 21 11 | Fax +41 58 580 21 21 | www.swissgrid.ch<br />
Page 4 of 21<br />
1 Introduction 5<br />
2 Reference documents 5<br />
3 <strong>Test</strong> procedure 5<br />
4 ESS formal and process management (schedule operation): 6<br />
4.1 Description of the test scenarios 6<br />
4.1.1 Messages using ESS v2r3 6<br />
4.1.2 Status Request 7<br />
4.1.3 Applied Formal <strong>Test</strong>s 7<br />
4.2 Formal test for TPS schedule messages 8<br />
4.2.1 Day-ahead, formal test, external and internal trade, unlimited capacity 8<br />
4.2.2 Intra-day, formal test, external trade, unlimited capacity 9<br />
4.2.3 Post scheduling adjustment; formal test, internal trade 10<br />
4.3 Matching process intraday 11<br />
4.3.1 Matching process intraday (Internal Trade) 11<br />
4.3.2 Matching process intraday (External Trade) 12<br />
4.4 Intra-day timing (Internal Trade) 12<br />
4.5 Post scheduling adjustment 14<br />
4.6 Imposed time series procedure 14<br />
4.7 Schedule message across auctioned border 15<br />
4.8 Single sided schedule procedure 17<br />
5 Optional <strong>Test</strong>s 18<br />
5.1 Status Request procedure 18<br />
6 Communication and configuration tests (schedule operation) 20<br />
6.1 General 20<br />
6.2 Communication and configuration testing of the e-mail connection 20<br />
6.3 Communication test of FTP link 21<br />
V 3.7