Specification Balance Group Acceptance Test - Swissgrid
Specification Balance Group Acceptance Test - Swissgrid
Specification Balance Group Acceptance Test - Swissgrid
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6.3 Communication test of FTP link<br />
Execution: Only relevant for new registrants<br />
Communication path: FTP over Internet or ISDN<br />
Purpose: To verify the FTP communication path<br />
Timing: D-1 before 10:00<br />
# System Under <strong>Test</strong> swissgrid BG Productive System<br />
1 BGR sends any TPS over the FTP link.<br />
2 Incoming message test<br />
3 Evaluation of ACK message and feedback on<br />
correct receipt to swissgrid.<br />
Note:<br />
If necessary, make corrections and repeat<br />
test from Step 1.<br />
swissgrid ag | Dammstrasse 3 | P.O. Box 22 | CH-5070 Frick | Phone +41 58 580 21 11 | Fax +41 58 580 21 21 | www.swissgrid.ch<br />
Page 21 of 21<br />
V 3.7<br />
Sends a positive ACK message (reason code A01) if<br />
everything is in order.<br />
Sends no ACK or a negative ACK message with the<br />
relevant reason codes if a schedule message error<br />
or system configuration error has been identified.<br />
The TPS contains all registered external business relationships (both directions, values = 0)<br />
The TPS contains all currently known internal business relationships within swissgrid (both directions, values<br />
= 0)<br />
Use Business Type A02 and A06.<br />
�