01.12.2012 Views

Specification Balance Group Acceptance Test - Swissgrid

Specification Balance Group Acceptance Test - Swissgrid

Specification Balance Group Acceptance Test - Swissgrid

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

# System Under <strong>Test</strong> KEMA <strong>Test</strong> System<br />

8 Sends an intermediate confirmation:<br />

� Reason code A06<br />

Note:<br />

� Intra-day schedule message must be drawn up for the current day<br />

� Status Request can be sent only after a TPS has been sent.<br />

swissgrid ag | Dammstrasse 3 | P.O. Box 22 | CH-5070 Frick | Phone +41 58 580 21 11 | Fax +41 58 580 21 21 | www.swissgrid.ch<br />

Page 19 of 21<br />

� A Status Request is not dependent whether an answer file from the regular process was already sent or<br />

not.<br />

� When this optional scenario is started it must be followed completely<br />

V 3.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!