4.2.3 Post scheduling adjustment; formal test, internal trade<br />

Scenario: 1c – Standard BG<br />

Execution: for new registered BG obligatory<br />

Purpose: Post scheduling adjustment; formal test, internal trade<br />

Timing: D+1 before 17:00<br />

# System Under <strong>Test</strong> KEMA <strong>Test</strong> System<br />

1 BGR sends a TPS:<br />

� Post Scheduling Adjustments (Process<br />

Type A13)<br />

� At least 1 time series with internal trade<br />

(business type A02)<br />

� Sender EIC code of standard BG<br />

2 For formally correct TPS:<br />

Sends a positive ACK message<br />

Note:<br />

� Reason code A01<br />

swissgrid ag | Dammstrasse 3 | P.O. Box 22 | CH-5070 Frick | Phone +41 58 580 21 11 | Fax +41 58 580 21 21 | www.swissgrid.ch<br />

Page 10 of 21<br />

� The post scheduling adjustment schedule message must be drawn up for the previous day (yesterday)<br />

� There must be no values > 0 in any time series outside the control area (external time series)<br />

� Once schedule operation is up and running, values > 0 will be available from upstream processes for time<br />

series outside control areas. However, they may no longer be changed in the post scheduling adjustment<br />

process. Since there are no prior schedule data in this test scenario, the time series outside the control<br />

area cannot contain values > 0<br />