for at least the first 5.0m from the carriageway edge and maintained as such<br />
thereafter.<br />
Reason:<br />
To prevent loose material being carried onto the highway in the interests of<br />
highway safety.<br />
8) Before the development hereby permitted is commenced, a scheme of surface<br />
water disposal from the driveways shall be submitted to and approved in writing<br />
by the Head of Development Services. The approved scheme shall then be<br />
implemented in full prior to the first occupation of the development.<br />
Reason:<br />
To ensure that surface water does not discharge onto the highway in the<br />
interests of highway safety.<br />
9) Notwithstanding the submitted plans, the development hereby permitted shall<br />
not be commenced until details of a 1.5m wide footway along the site frontage<br />
parallel to the dwellings, which is suitable for adoption as a public highway<br />
have been submitted to and approved in writing by the Head of Development<br />
Services. The approved scheme shall then be implemented in full prior to the<br />
first occupation of any residential unit and maintained as such thereafter.<br />
Reason:<br />
In the interests of highway safety.<br />
<strong>10</strong>) Notwithstanding the submitted drawing, the development hereby permitted<br />
shall not be commenced until details of a scheme to reduce the boundary<br />
walling / fencing to a height no greater than 1.0m above the adjacent<br />
carriageway level within the control of the applicant adjacent to Churchfield<br />
Road, have been submitted to and approved in writing by the Head of<br />
Development Services. The approved scheme shall then be implemented in full<br />
prior to the first occupation of the development and maintained as such<br />
thereafter.<br />
Informatives:<br />
Reason:<br />
In the interests of highway safety.<br />
1) For the purposes of the Town and Country <strong>Planning</strong> (General Development<br />
Procedure) (England) (Amendment) Order 2003, the following reasons for the<br />
<strong>Council</strong>'s decision are summarised below together with a summary of the<br />
Policies and Proposals contained within the Development Plan which are<br />
relevant to this decision: The proposal represents an acceptable form of infill<br />
residential development located within the defined settlement boundary. The<br />
design and scale of the proposed units are in keeping with the character and<br />
appearance of the surrounding built form with the units having suitable levels of<br />
amenity space. In light of the authorised use of the site as a builders yard, the<br />
overall impact on highway safety and the surrounding road network is<br />
acceptable with conditions imposed regarding further highway improvements.<br />
In this manner the scheme accords with Policies H14 and G5 of the <strong>Stroud</strong><br />
<strong>District</strong> Local Plan Revised Deposit Version (as amended June 2001).<br />
2) 1 Vehicular crossing over highway land<br />