Planning Schedule Date: 10/08/2004 carried out without the prior written consent of the Head of Development Services. f) Any existing trees not shown as being removed on the approved drawings which die, are removed or become so damaged or diseased within a period of 5 years from the completion of development that they have to be removed, must be replaced as soon as reasonably practicable. In practice, this will be during the next available planting season. The size, species and location of the replacement tree(s) must be agreed in writing by the Head of Development Services. Reason: To ensure the health and safety of the trees on the site and to ensure continuity of the visual amenity that they provide. 6. No development shall take place on the land adjacent to the King George V playing field until details for the protection and long term retention of the tree situated on the boundary and located between levels 87.12 and 87.72 have been submitted to and agreed in writing by the Head of Development Services. Such details shall include measures so that the root system is not disturbed. The development shall then be carried out in accordance with the details so agreed. Reason: To ensure the tree concerned is not damaged and is retained for the long term. In the interests of amenity. 7. The development hereby authorised must not be commenced until details regarding the location and practicalities of temporary parking, temporary entrances, temporary accommodation and delivery/materials storage areas have been submitted to and approved in writing by the Head of Development Services. Reason: To ensure the trees and other natural features of the site which are shown as retained are not damaged, destroyed or otherwise compromised by the need to ensure implementation of the above to secure the approved development. 8. No siteworks shall commence until such time as a temporary car parking area for site operatives and construction traffic has been laid out and constructed within the site in accordance with details to be submitted to and agreed in writing by the Head of Development Services and that area shall be retained available for that purpose for the duration of building operations. Reason: To ensure the access roads in the vicinity of the site are kept free from construction traffic, in the interests of highway safety. 9. Surface water drainage shall be discharged via soakaways so long as it is clean and any other surface water shall be disposed of via discharge to a deep trap interceptor gully prior to discharge to any soakaway. The car parking bays at the Stadium part of the site shall be finished in gravel to allow direct drainage to the subsoil. Reason: 52
Planning Schedule Date: 10/08/2004 To comply with Policy G2 of the Stroud District Local Plan Revised Deposit Version (as amended June 2001). To prevent pollution of the water environment. To provide a drainage system in accordance with SUD's principles. 10. Prior to the commencement of building operations details shall be submitted to and agreed in writing by the Head of Development Services which demonstrate surface water run-off is not exceeded beyond current site conditions. The development shall then be carried out in accordance with the details so agreed. Reason: To prevent adverse surface water run-off conditions, to comply with Policy G2 of the Stroud District Local Plan Revised Deposit Version (as amended June 2001). 11. Prior to the commencement of any development, a scheme for the provision and implementation of surface water limitation shall be submitted to and agreed in writing with the Head of Development Services. The works/scheme shall be constructed and completed in accordance with the plans and timetable approved by the Head of Development Services. Reason: To prevent the increased risk of flooding in accordance with Planning Policy Guidance Note 25 Development & Flood Risk (PPG25) and Policy G4 of the Stroud District Local Plan Revised Deposit Version (as amended June 2001). 12. Before the stadium part of the development is brought into use provision shall be made within the site for the disposal of surface water from the stadium site/access roads in accordance with details to be submitted to and agreed in writing by the Head of Development Services and the works as approved shall thereafter be similarly maintained. Reason: To ensure that surface water does not discharge onto the highway, in the interests of highway safety. 13. The development hereby permitted shall not be brought into use until works for the disposal of sewage have been provided on site to serve the development, in accordance with details to be submitted to and agreed in writing by the Head of Development Services, prior to the commencement of development. Reason: To ensure adequate provision is made for the disposal of sewage. 14. The Development hereby permitted shall not be brought into use until the new access leading from the Stadium to Nympsfield Road has been completed to at least base course level. Reason: In the interests of highway safety and to ensure a suitable access is constructed to the site for its construction. To comply with Policy G5 of the Stroud District Local Plan Revised Deposit Version (as amended 53
- Page 1 and 2: Stroud District Council SCHEDULE OF
- Page 3 and 4: Planning Schedule Date: 10/08/2004
- Page 5 and 6: ITEM No: 01 Application: S.01/436 P
- Page 7 and 8: Materials: Roof Conc int tiles Wall
- Page 9 and 10: Planning Schedule Date: 10/08/2004
- Page 11 and 12: Relevant Planning History Planning
- Page 13 and 14: ITEM No: 02 Application: S.03/1451
- Page 15 and 16: Planning Schedule Date: 10/08/2004
- Page 17 and 18: Planning Schedule Date: 10/08/2004
- Page 19 and 20: POLICY B9 Planning Schedule Date: 1
- Page 21 and 22: Consultations/Representations: Pari
- Page 23 and 24: Planning Schedule Date: 10/08/2004
- Page 25 and 26: Planning Schedule Date: 10/08/2004
- Page 27 and 28: Planning Schedule Date: 10/08/2004
- Page 29 and 30: Consultations/Representations: Pari
- Page 31 and 32: Planning Schedule Date: 10/08/2004
- Page 33 and 34: Neighbour Contributions Site Locati
- Page 35 and 36: Planning Schedule Date: 10/08/2004
- Page 37 and 38: Consultations/Representations: Pari
- Page 39 and 40: Planning Schedule Date: 10/08/2004
- Page 41 and 42: Site Location: Site Report: Plannin
- Page 43 and 44: Planning Schedule Date: 10/08/2004
- Page 45 and 46: Planning Schedule Date: 10/08/2004
- Page 47 and 48: Planning Schedule Date: 10/08/2004
- Page 49 and 50: Planning Schedule Date: 10/08/2004
- Page 51: Planning Schedule Date: 10/08/2004
- Page 55 and 56: Planning Schedule Date: 10/08/2004
- Page 57 and 58: Planning Schedule Date: 10/08/2004
- Page 59 and 60: Consultations/Representations: Pari
- Page 61 and 62: Planning Schedule Date: 10/08/2004
- Page 63 and 64: Planning Schedule Date: 10/08/2004
- Page 65 and 66: Planning Schedule Date: 10/08/2004
- Page 67 and 68: Planning Schedule Date: 10/08/2004
- Page 69 and 70: Planning Schedule Date: 10/08/2004
- Page 71 and 72: Planning Schedule Date: 10/08/2004
- Page 73 and 74: Planning Schedule Date: 10/08/2004
- Page 75 and 76: Planning Schedule Date: 10/08/2004
- Page 77 and 78: Planning Schedule Date: 10/08/2004
- Page 79 and 80: Planning Schedule Date: 10/08/2004
- Page 81 and 82: Planning Schedule Date: 10/08/2004
- Page 83 and 84: Planning Schedule Date: 10/08/2004
- Page 85 and 86: Planning Schedule Date: 10/08/2004
- Page 87 and 88: Planning Schedule Date: 10/08/2004
- Page 89 and 90: Planning Schedule Date: 10/08/2004
- Page 91 and 92: Consultations/Representations: Pari
- Page 93 and 94: Planning Schedule Date: 10/08/2004
- Page 95 and 96: Planning Schedule Date: 10/08/2004
- Page 97 and 98: Planning Schedule Date: 10/08/2004
- Page 99 and 100: ITEM No: 12 Application Site Addres
- Page 101 and 102: Site Location: Site Report: Plannin
<strong>Planning</strong> <strong>Schedule</strong> <strong>Date</strong>: <strong>10</strong>/<strong>08</strong>/<strong>2004</strong><br />
To comply with Policy G2 of the <strong>Stroud</strong> <strong>District</strong> Local Plan Revised<br />
Deposit Version (as amended June 2001). To prevent pollution of the<br />
water environment. To provide a drainage system in accordance with<br />
SUD's principles.<br />
<strong>10</strong>. Prior to the commencement of building operations details shall be<br />
submitted to and agreed in writing by the Head of Development Services<br />
which demonstrate surface water run-off is not exceeded beyond current<br />
site conditions. The development shall then be carried out in accordance<br />
with the details so agreed.<br />
Reason:<br />
To prevent adverse surface water run-off conditions, to comply with<br />
Policy G2 of the <strong>Stroud</strong> <strong>District</strong> Local Plan Revised Deposit Version (as<br />
amended June 2001).<br />
11. Prior to the commencement of any development, a scheme for the<br />
provision and implementation of surface water limitation shall be<br />
submitted to and agreed in writing with the Head of Development<br />
Services. The works/scheme shall be constructed and completed in<br />
accordance with the plans and timetable approved by the Head of<br />
Development Services.<br />
Reason:<br />
To prevent the increased risk of flooding in accordance with <strong>Planning</strong><br />
Policy Guidance Note 25 Development & Flood Risk (PPG25) and Policy<br />
G4 of the <strong>Stroud</strong> <strong>District</strong> Local Plan Revised Deposit Version (as<br />
amended June 2001).<br />
12. Before the stadium part of the development is brought into use provision<br />
shall be made within the site for the disposal of surface water from the<br />
stadium site/access roads in accordance with details to be submitted to<br />
and agreed in writing by the Head of Development Services and the<br />
works as approved shall thereafter be similarly maintained.<br />
Reason:<br />
To ensure that surface water does not discharge onto the highway, in the<br />
interests of highway safety.<br />
13. The development hereby permitted shall not be brought into use until<br />
works for the disposal of sewage have been provided on site to serve the<br />
development, in accordance with details to be submitted to and agreed in<br />
writing by the Head of Development Services, prior to the<br />
commencement of development.<br />
Reason:<br />
To ensure adequate provision is made for the disposal of sewage.<br />
14. The Development hereby permitted shall not be brought into use until the<br />
new access leading from the Stadium to Nympsfield Road has been<br />
completed to at least base course level.<br />
Reason:<br />
In the interests of highway safety and to ensure a suitable access is<br />
constructed to the site for its construction. To comply with Policy G5 of<br />
the <strong>Stroud</strong> <strong>District</strong> Local Plan Revised Deposit Version (as amended<br />