12.07.2015 Views

2013–2014 BIENNIAL BUDGET - the City of Tukwila

2013–2014 BIENNIAL BUDGET - the City of Tukwila

2013–2014 BIENNIAL BUDGET - the City of Tukwila

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2013–2014 Biennial Budget <strong>City</strong> <strong>of</strong> <strong>Tukwila</strong>, WashingtonGoals and AccomplishmentsDEPARTMENT: Public Works DIVISION: 01/02/98FUND: Sewer FUND NUMBER: 402RESPONSIBLE MANAGER: Bob GibersonPOSITION: DirectorDescriptionThe mission <strong>of</strong> <strong>the</strong> Sewer Utility is to operate and maintain a sewer collection system that will ensure <strong>the</strong>health, safety, and welfare <strong>of</strong> <strong>the</strong> citizens and visitors <strong>of</strong> <strong>Tukwila</strong>. The Sewer Utility is responsible for <strong>the</strong>maintenance <strong>of</strong> approximately 40 miles <strong>of</strong> gravity sewer main and <strong>the</strong> operation and maintenance <strong>of</strong>twelve lift stations and force mains. These lift stations pump approximately 60% <strong>of</strong> all sewage in <strong>the</strong> <strong>City</strong>(approximately 460 million gallons). The Sewer Utility maintains relationships with adjoiningjurisdictions, cities, water districts, sewer districts, King County Department <strong>of</strong> Natural Resources &Parks, Wastewater Treatment Division, State Department <strong>of</strong> Ecology, State Department <strong>of</strong> Health, andKing County Health Department.2011-2012 Accomplishments♦ Evaluated system-wide conditions for potential upgrades for Annual Sewer Repair Program.♦ Implemented a system for remote monitoring <strong>of</strong> sewer lift stations - response and corrective actioncan be achieved from laptop computer.♦ Completed Sewer Comprehensive Plan.♦ Completed construction <strong>of</strong> <strong>the</strong> South <strong>City</strong> Limits sewer improvements (coordinated with <strong>the</strong>Southcenter Parkway Extension Project).♦ Completed construction <strong>of</strong> <strong>the</strong> Interurban Ave S Gravity Sewer Project.2013 Program Goals♦ Evaluate system-wide conditions for potential upgrades for Annual Sewer Repair Program.♦ With replacement <strong>of</strong> video inspection van, implement new s<strong>of</strong>tware with training.♦ Adopt Sewer Comprehensive Plan.♦ Complete construction <strong>of</strong> CBD Sanitary Sewer Rehabilitation.♦ Replace generator and concrete slab at Sewer Lift Station No. 2.2014 Program Goals♦ Evaluate system-wide conditions for potential upgrades for Annual Sewer Repair Program.♦ Begin design <strong>of</strong> Future Sewer Lift Station No. 13.♦ Begin design <strong>of</strong> Southcenter Blvd and 5700 Southcenter Blvd Sewer Upgrades.Page 305

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!