12.07.2015 Views

AIR CONDITIONER - Heronhill Air Conditioning Ltd

AIR CONDITIONER - Heronhill Air Conditioning Ltd

AIR CONDITIONER - Heronhill Air Conditioning Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8-5-3. EvacuatingAfter the piping has been connected to the indoor unit,you can perform the air purge together at once.<strong>AIR</strong> PURGEEvacuate the air in the connecting pipes and in theindoor unit usinga vacuum pump. Do not use the refrigerant in theoutdoor unit.For details, see the manual of the vacuum pump.Be sure to use a vacuum pump with counter-flowprevention function so that inside oil of the pump doesnot flow backward into pipes of the air conditionerwhen the pump stops. (If oil inside of the vacuum pumpenters into the air conditioner, which use R410A,refrigeration cycle trouble may result.)1. Connect the charge hose from the manifold valve tothe service port of the gas side packed valve.2. Connect the charge hose to the port of the vacuumpump.3. Open fully the low pressure side handle of thegauge manifold valve.4. Operate the vacuum pump to start evacuating.Perform evacuating for about 15 minutes if the pipinglength is 20 meters. (15 minutes for 20 meters)(assuming a pump capacity of 27 liters per minute.)Then confirm that the compound pressure gaugereading is −101 kPa (−76 cmHg).5. Close the low pressure side valve handle of gaugemanifold.6. Open fully the valve stem of the packed valves(both sides of Gas and Liquid).7. Remove the charging hose from the service port.8. Securely tighten the caps on the packed valves.• Open the valve stem all the way out; but do not tryto open it beyond the stopper.• Securely tighten the valve stem cap with torque inthe following table:Gas side(∅12.70 mm)Gas side(∅9.52 mm)Liquid side(∅6.35 mm)Service portFILE NO. SVM-05020Fig. 8-5-850 to 62 N·m(5.0 to 6.2 kgf·m)30 to 42 N·m(3.0 to 4.2 kgf·m)16 to 18 N·m(1.6 to 1.8 kgf·m)9 to 10 N·m(0.9 to 1.0 kgf·m)Hexagonal wrenchis required.4 mmCompound pressure gaugePressure gauge-101kPa (-76cmHg)Handle LoCharge hose(For R410A only)Connecting pipeManifold valveHandle Hi(Keep full closed)Charge hose(For R410A only)Vacuum pumpadapter forcounter-flowprevention(For R410A only)VacuumpumpPacked valve at gas sideService port(Valve core (Setting pin))Packed valve at liquid sideFig. 8-5-7− 50 −

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!