12.07.2015 Views

AIR CONDITIONER - Heronhill Air Conditioning Ltd

AIR CONDITIONER - Heronhill Air Conditioning Ltd

AIR CONDITIONER - Heronhill Air Conditioning Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7-6. Defrost Operation *Heat pump model onlyDuring the heating operation, the outdoor heatexchanger temperature goes down and sometimes it isfrozen.In this case, the air conditioner stops the heatingoperation and starts the defrost operation to melt ice.7-6-1. Condition to start the defrost operationThe defrost operation starts whichever belowconditions are satisfied.(1) When the cumulative compressor operating time islonger than 40 or 90 minutes and differencebetween the indoor heat exchanger temperatureand the room temperature is less than thespecified value. (This value is decided by themicroprocessor.) (Control example is shown inFig. 7-6-1. In case of B or C, the defrost operationstarts.)(2) When the current limit control or the hightemperature limit control is performed for total of90 minutes.Indoor heat exchanger temp- Room tempADBCCumulativecompressoroperating timeDEFROST LAMP :FILE NO. SVM-05020(1) The heating operation is performed for at least 90minutes.(2) The defrost operating time is 10 minutes.7-6-3. Ending condition at defrost operation(1) When the compressor current becomes 7.5A ormore during defrost operation, the defrostoperation stops and the heating operation restarts.(The current sensor detects the compressorcurrent.)(2) The defrost operation continues for at most6 minutes or 10 minutes.· During defrost operation, the PRE-DEF. lamp ison and the indoor and outdoor fans are off.· The compressor start protection timer is interlookedwith the PRE-DEF. lamp. So the PRE-DEF.Lamp is off (the fans stop) for about 3 minutesafter the [ ] button is turned on. Whenthe compressor is turned on, the PRE-DEF. lampcomes on. After the heat ex-changer is preheatedto about 24 °C or higher, the PRE-DEF. Lampgoes off, and the indoor fan starts.Fig. 7-6-1 (Indoor fan speed : M)7-6-2. Defrost operation time control(1) The heating operation is performed for at least40 minutes.(2) The maximum defrost operating time is 6 minutes.The defrost operating time for the 4th cycle is10 minutes. (When the outdoor temperature isvery low, however, the defrost operating time is10 minutes.)minutes40minutes40minutes40minutes40HeatingDefrostHeatingDefrostHeatingDefrostHeatingDefrostMax 6 minutes10 minutes1 cycleFig. 7-6-2- 31 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!