395 - GSA Development of St. Elizabeths Campus
395 - GSA Development of St. Elizabeths Campus
395 - GSA Development of St. Elizabeths Campus
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2.4.5.2 Local <strong>St</strong>reet NetworkFuture needs along the local street network are highlighted as follows:• Provision <strong>of</strong> adequate capacity at major intersections, especially for heavy turningmovements and side streets• Optimization <strong>of</strong> signal timing and phasing parameters along corridors such as AlabamaAvenue, Martin Luther King Jr. Avenue, Firth <strong>St</strong>erling Avenue, Suitland Parkway, andSouth Capitol <strong>St</strong>reet in order to better accommodate the competing traffic andmultimodal demands at intersections• Construction <strong>of</strong> adequate pedestrian and bicycle facilities that are continuous, sized toaccommodate future demand, and connected within a system-wide network• Adequate design configuration and operational functionality to accommodate newtransit services and potential increases in existing transit services2-15