12.07.2015 Views

395 - GSA Development of St. Elizabeths Campus

395 - GSA Development of St. Elizabeths Campus

395 - GSA Development of St. Elizabeths Campus

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

sidewalks, buffer area, parking on both sides, five travel lanes and a raised median withleft turn bays. In addition, a new signal is installed at the Martin Luther King Jr.Avenue/DHS Gate 2 intersection.• The estimated construction cost for Alternative 2 is approximately $105 million,including $92.2 million for the I-295/SCS/Malcolm corridors and $12.8 million for theMLK Jr. Avenue corridor.Traffic operation analysis for Alternative 2 is provided in Section 5.5 <strong>of</strong> this document.2.4.3 Build Transportation Alternative 2 ModifiedAlternative 2 Modified describes the second <strong>of</strong> two recommended transportation improvementplans that are chosen for further analysis for the Build scenario, which assumes that DHSconsolidation and relocation to <strong>St</strong>. <strong>Elizabeths</strong> does occur. Transportation improvementssuggested under this alternative for the West and East <strong>Campus</strong>es and surrounding network arelisted below:• Similar to Alternative 2, the West Access Road will be extended to the south to MalcolmAvenue and to a new elevated signalized intersection to tie to I-295 and SCS. Howeverthe fly-over ramp is modified to minimize construction footprint.• At the I-295/Malcolm X Avenue interchange, similar improvements to Alternative 2 areproposed except:- Change configuration <strong>of</strong> the two new fly-over ramps from/to I-295 so that only onenew bridge is needed to be constructed over I-295- The new I-295 NB on-ramps from both EB and WB Malcolm X Avenue merge firstinto one single collector-distributor road before further merging onto I-295 NB.Realign the new connection from the new elevated signalized intersection to theMalcolm X Avenue to minimize impact to the adjacent NPS land• Martin Luther King Jr. Avenue will be modified. Between Golden Raintree Drive andLebaum <strong>St</strong>reet it will have sidewalks, buffer and five travel lanes including a centerTWLT lane; from Lebaum <strong>St</strong>reet to Alabama Avenue it will have sidewalks, buffer area,parking on both sides, five travel lanes and a raised median with left turn bays. Inaddition, a new signal is installed at the Martin Luther King Jr. Avenue/DHS Gate 2intersection.• Shuttle buses will provide service from the two nearby Metrorail stations <strong>of</strong> Anacostiaand Congress Heights to the West and East <strong>Campus</strong> gates, with details still beingworked out with WMATA.• The estimated construction cost for Alternative 2 Modified is approximately $123.7million, including $114.4 million for the I-295/SCS/Malcolm corridors and $9.3 millionfor the MLK Jr. Avenue corridor.• It would require taking some 9.2 acres <strong>of</strong> NPS Parkland.• Details <strong>of</strong> the Alternative 2 Modified are provided in the following sections.2-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!