12.07.2015 Views

395 - GSA Development of St. Elizabeths Campus

395 - GSA Development of St. Elizabeths Campus

395 - GSA Development of St. Elizabeths Campus

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.4.2 Build Transportation Alternative 2Alternative 2 describes the first <strong>of</strong> two recommended transportation improvement plans thatare chosen for further analysis for the Build scenario, which assumes that DHS consolidationand relocation to <strong>St</strong>. <strong>Elizabeths</strong> does occur. Transportation improvements suggested under thisalternative include providing new access to <strong>St</strong>. <strong>Elizabeths</strong>, modifying existing connectionsbetween network links in the vicinity, and changing roadway geometry and operations toimprove efficiency. For the key improvement <strong>of</strong> Malcolm X Avenue at I-295 in this alternative,the cost estimate is $92.2 million. It would also require taking some 10.2 acres <strong>of</strong> NPS Parkland.Specific transportation improvements suggested under this alternative for the West and East<strong>Campus</strong>es and surrounding network are listed below:• A new north-south three-lane arterial called the West Access Road, which providesvehicle and pedestrian connections between Firth <strong>St</strong>erling Avenue and Malcolm XAvenue, will be built. The north portion <strong>of</strong> the West Access Road between Gate 4 andFirth <strong>St</strong>erling Avenue is included in the amended Record <strong>of</strong> Decision (September 28,2011) issued as part <strong>of</strong> the TIER I EIS for the West <strong>Campus</strong> therefore it is included in NoAction alternative. In the Alternative 2, the West Access Road will be extended fromGate 4 to the south to connect with Malcolm X Avenue at a reconfigured 4-leg signalizedintersection and to connect with I-295 and South Capitol <strong>St</strong>reet via a fly-over rampconnection, a new elevated signalized intersection and new slip ramps. The extension <strong>of</strong>West Access Road will include two inbound lanes and one outbound lane.• The I-295/Malcolm X Avenue interchange is modified as follows:- Replace the existing I-295 NB loop <strong>of</strong>f-ramp with a new one-lane slip ramp furthersouth to connect to a collector-distributor road which then connects to a newelevated signalized intersection- Remove the existing I-295 SB fly-over ramp to SCS and replace with a new one-lane<strong>of</strong>f-ramp that connects directly to the elevated signalized intersection- A two-lane roadway will allow traffic access the reconfigured Malcolm X Avenueintersection from the elevated intersection- A two-lane-two way fly-over ramp will connect between West Access Road and theelevated intersection- A one-lane fly-over ramp will allow traffic to access I-295 SB from the elevatedintersection- Bicycle accommodation is included as outlined in the SCS improvements including abike lane on SCS in both directions from Suitland Parkway to SCS (south end)• A new one-lane slip ramp will connect the SCS NB to the collector-distributor road inorder to access Malcolm X Avenue or West Access Road.• The South Capitol <strong>St</strong>reet/Malcolm X Avenue interchange will remain the same.• Martin Luther King Jr. Avenue will be modified. Between Golden Raintree Drive andLebaum <strong>St</strong>reet it will have sidewalks, buffer and five travel lanes including a center twoway-left-turn(TWLT) lane; from Lebaum <strong>St</strong>reet to Alabama Avenue it will have2-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!