12.07.2015 Views

Selected Bibliography of Municipal Ownership Feasibility Studies ...

Selected Bibliography of Municipal Ownership Feasibility Studies ...

Selected Bibliography of Municipal Ownership Feasibility Studies ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Population *<strong>Selected</strong> <strong>Bibliography</strong> <strong>of</strong> <strong>Municipal</strong> <strong>Ownership</strong> <strong>Feasibility</strong> <strong>Studies</strong>American Public Power Association1875 Connecticut Ave., NW, Suite 1200Washington, DC 20009-5715115,000 Skagit County PUD, Washington. Preliminary <strong>Feasibility</strong> Study related to SkagitCounty Public Utility District Electric System Acquisition. Prepared by D. Hittle &Associates. June 2008. 71 pp. Available electronically.92,196 City <strong>of</strong> Boulder, Colorado. Final Report City <strong>of</strong> Boulder, Preliminary<strong>Municipal</strong>ization <strong>Feasibility</strong> Study. Prepared by R.W. Beck. October 2005. 65 pp.Available electronically.173,556 City <strong>of</strong> Chula Vista, California. City <strong>of</strong> Chula Vista <strong>Municipal</strong> Energy Utility<strong>Feasibility</strong> Analysis Report. Prepared by Duncan, Weinberg, Genzer & PembrokeP.C., McCarthy & Berlin L.L.P., and Navigant Consulting. March 2004. 186 pp.Available electronically.776, 733 † East Bay <strong>Municipal</strong> Utility District, California. Potential Roles as an ElectricUtility. Prepared by R. W. Beck, Inc., Sacramento, California, February 2002. 134pp. Rept. 222424,090 City <strong>of</strong> Winter Park, Florida. Electric System <strong>Municipal</strong>ization <strong>Feasibility</strong> Study.Prepared by Black & Veatch Corp., Kansas City, Missouri, May 2001. 48 pp. Rept.2223. Available electronically.3,105 Village <strong>of</strong> Hamburg, New York. Report to the Incorporated Village <strong>of</strong> Hamburg onthe <strong>Feasibility</strong> and Creation <strong>of</strong> a Village <strong>of</strong> Hamburg <strong>Municipal</strong> Electric Utility.Prepared by Power Alternatives, Inc., East Setauket, New York, April 2001. 71 pp.Rept. 2221.351,150 Wichita, Kansas. Final Report City <strong>of</strong> Wichita, Kansas, <strong>Municipal</strong>ization <strong>Feasibility</strong>Study. Prepared by R.W. Beck, Denver, Colo., Feb. 2001. 62 pp. Rept. 2222.39,758 ‡ Dunedin and Belleair, Florida. <strong>Municipal</strong>ization Study. Prepared by StrategicEnergy L.L.C., Pittsburgh, Penn., 2000. 43 pp. Rept. 2225.26,884 Dover, New Hampshire. Preliminary <strong>Feasibility</strong> Study for Electric System<strong>Municipal</strong>ization. Prepared by R.W. Beck in Association with Duncan, Weinberg,Miller & Pembroke, PC, Framingham, Mass., 1996. 43 pp. Rept. 2215.42,807 Palm Springs, California. Preliminary <strong>Feasibility</strong> for Electric System<strong>Municipal</strong>ization for the City <strong>of</strong> Palm Springs, Final Report. Prepared by R.W. Beck& Associates, Sacramento, California, 1994. 39 pp. Rept. 2213.74,267 Las Cruces, New Mexico. Evaluation <strong>of</strong> Alternative Energy Sources, Final Report.Prepared by SVBK Consulting Group, Denver, Colorado and Molzen-Corbin &Associates, Las Cruces, New Mexico, 1994. 191 pp. Rept. 2209.* According to 2000 Census data.† This reflects the entire population <strong>of</strong> San Francisco. EBMUD is a water/wastewater utility serving the eastside <strong>of</strong> the San Francisco Bay.‡ This is the combined population <strong>of</strong> Dunedin and Belleair. Individually, Dunedin’s population is 35,691 andBelleair’s population is 4,067.


Las Cruces, New Mexico. Update to the SENSE Task Force Energy OptionsAnalysis, Final Report. Prepared by R.W. Beck and Associates, Denver, Colorado,1994. 102 pp. Executive Summary, 16 pp. Rept. 2211.Las Cruces, New Mexico. SENSE Task Force Energy Options Analysis FinalReport, Vol. 1 and 3 (Volume 3 covers some issues for Albuquerque as well.)Prepared by R.W. Beck and Associates, Denver, Colorado, 1991. 168 pp. Rept.2210.313,619 Toledo, Ohio. Phase II Competitive Electric System <strong>Feasibility</strong> Study: ProjectTermination Report. Prepared by SVBK Consulting Group, Denver, Colorado, 1994.46 pp. Rept. 2214.Toledo, Ohio. Report <strong>of</strong> the electric Franchise Review Committee. 1992. 187 pp.Rept. 2205.9,275 Alma, Michigan. Preliminary Study <strong>of</strong> the <strong>Feasibility</strong> <strong>of</strong> Establishing a <strong>Municipal</strong>Electric System in Alma, Michigan. Prepared by Courtney & Associates, Findlay,Ohio, 1994. 73 pp. Rept. 2202.563,662 El Paso, Texas. Electric System <strong>Municipal</strong>ization: Pre-feasibility Analysis.Prepared by the Texas Public Power Association, Austin, Texas, 1993. 15 pp.Rept. 2204.21,218 Brook Park, Ohio. Preliminary Study <strong>of</strong> the <strong>Feasibility</strong> <strong>of</strong> Establishing a <strong>Municipal</strong>System in Brook Park, Ohio. Prepared by John T. Courtney, Courtney &Associates, Findlay, Ohio; Gregg D. Ottinger, Duncan and Allen, Washington, DC;and James R. Dittmer, Dittmer, Brosh and Associates, Lee’s Summit, Missouri,1991. 36 pp. Rept. 2201.74,239 Evanston, Illinois. Preliminary Study <strong>of</strong> the <strong>Feasibility</strong> <strong>of</strong> Establishing a <strong>Municipal</strong>Electric System in Evanston, Illinois. Prepared by John T. Courtney, Courtney &Associates, Findlay, Ohio; Gregg D. Ottinger, Duncan and Allen, Washington, DC;and James R. Dittmer, Dittmer, Brosh and Associates, Lee’s Summit, Missouri,1991. 22 pp. Rept. 2203.1,790 West Unity, Ohio. Preliminary Investigation <strong>of</strong> the <strong>Feasibility</strong> <strong>of</strong> Establishing a<strong>Municipal</strong>ly Owned Electric System in West Unity, Ohio. Prepared by Courtney &Associates, Findlay, Ohio, 1991. 24 pp. Rept. 2200.4,290 Archbold, Ohio. Detailed Analysis <strong>of</strong> the Costs & Benefits <strong>of</strong> the Village <strong>of</strong>Archbold, Ohio Owning and Operating an Electric System. Prepared by Courtney &Associates, Findlay, Ohio, 1990. 101 pp. Rept. 2197.6,314 Rittman, Ohio. Investigation <strong>of</strong> Power Supply Alternatives for city <strong>of</strong> Rittman, Ohio.Prepared by Courtney & Associates, Findlay, Ohio, 1990. 47 pp. Rept. 2198.1,223,400 San Diego, California. SDG&E study: Public <strong>Ownership</strong> Alternatives. Preparedfor San Diego County Water Authority by R.W. Beck & Associates. Sacramento,California, 1989. 3 vols. 348 pp. Executive Summary, 16 pp. Rept. 2194.86,605 Nashua, New Hampshire. A <strong>Feasibility</strong> Study on the Separation <strong>of</strong> Nashua, NewHampshire From the Electricity Service Area <strong>of</strong> Public Service <strong>of</strong> New Hampshireand the Formation <strong>of</strong> a <strong>Municipal</strong> Utility. Prepared for the Nashua EnergyCommittee by Kenneth Jones, John F. Kennedy School <strong>of</strong> Government, HarvardUniversity, 1987. 125 pp. Rept. 2191.


322,959 § Lane County, Oregon. Final Engineering and <strong>Feasibility</strong> Report: EmeraldPeople’s Utility District. Prepared by Center 4 Engineering, Redmond, Oregon,1981. 105 pp. Rept. 2190.923,459 Westchester County, New York. A Collection <strong>of</strong> Documents Relating toWestchester County, New York’s Attempted Takeover <strong>of</strong> Consolidated Edison’sDistribution Facilities 1977-1979. Compiled by the APPA Library staff. Loose-leaf.1981. Rept. 1926.Westchester County, New York. A Summary <strong>of</strong> the Preliminary Legal Study andReport Respecting the <strong>Feasibility</strong> <strong>of</strong> Establishing a Publicly Owned Electric Systemand Securing Bulk Power in and for Westchester County, New York. Prepared byDuncan, Brown, Weinberg & Palmer. Washington, DC, 1977. 22 pp. Rept. 1322.43,560 Columbia River PUD, Oregon. Public <strong>Ownership</strong> <strong>of</strong> the Electric DistributionFacilities in Columbia County, Oregon. Prepared by D.H. Little and Associates,Richland, Washington, 1980. 31 pp. Rept. 2206.13,121 Massena, New York. Rebuttal to the R.W. Beck & Associates <strong>Feasibility</strong>Acquisition and Operation <strong>of</strong> Electric Distribution Report on System Submitted to the<strong>of</strong>ficials <strong>of</strong> the Village and Town <strong>of</strong> Massena, New York and Their Residents.Prepared by Niagara Mohawk Power Corporation. Massena, New York, 1974. 54pp. Fold-out maps. Rept. 530.Massena, New York. <strong>Feasibility</strong> Report on Acquisition and Operation <strong>of</strong> ElectricDistribution System, Village and Town <strong>of</strong> Massena, New York. Prepared by R.W.Beck & Associates, Boston, Massachusetts, 1973. 59 pp. Fold-out appendices.Rept. 126.Revised 6/08Copies <strong>of</strong> the reports are available from:Ursula SchryverAmerican Public Power Association1875 Connecticut Ave., NWSuite 1200Washington, DC 20009-5715202/467-2980www.APPAnet.org§ The Emerald People’s Utility District does not serve all <strong>of</strong> Lane County, but rather 5 districts within thecounty. For more information, see their web site at www.epud.org/.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!