South Branch:ROAD CORRIDOR X• Works have started on the sections:E75 - 40 km of planned 74 kmE80 - 50 km of planned 84 km• Works on Dimitrovgrad bypass areongoing 8.6 km• For the construction of road Corridor Xtotal amount of EUR 1.2 billion is provided

ROAD CORRIDOR XI – Route 4u Length of Corridor XI on the territory of theRepublic of Serbia is 258 kmu Construction is ongoing on the sectionsin length of 52,5 km and Vrsac bypass(8.6 km)• Works are expected on the sections in length of50 km (Obrenovac – Ub ,26 km and Lajkovac –Ljig, 24 km)

South Branch:ROAD CORRIDOR X• Works have started on the sections:E75 - 40 km of planned 74 kmE80 - 50 km of planned 84 km• Works on Dimitrovgrad bypass areongoing 8.6 km• For the construction of road Corridor Xtotal amount of EUR 1.2 billion is provided