Manual for Refrigeration Servicing Technicians - UNEP - Division of ...
Manual for Refrigeration Servicing Technicians - UNEP - Division of ...
Manual for Refrigeration Servicing Technicians - UNEP - Division of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4<br />
<strong>Servicing</strong> Practices<br />
Electronic charging machines<br />
During larger-scale manufacturing, equipment tends to be charged<br />
using electronically controlled charging machines. These generally<br />
measure refrigerant into a system using precise mass flow meters,<br />
and are generally accurate to ±0.5g or better.<br />
Vapour refrigerant charging<br />
Vapour refrigerant charging is the process <strong>of</strong> moving vapour out <strong>of</strong><br />
the vapour space <strong>of</strong> the refrigerant cylinder to the low-pressure side<br />
<strong>of</strong> the system. Charging while the system is running is acceptable as<br />
cylinder, close the charging cylinder valve and operate the system<br />
<strong>for</strong> 1-2 minutes until the low-pressure side reading indicates lower<br />
reading than the charging<br />
cylinder.<br />
long as the suction pressure is closely checked during the charging<br />
3 - Continue adding refrigerant by<br />
process. Due to pressure difference consideration, the cylinder<br />
opening the charging cylinder<br />
pressure could become lower than<br />
valve until the proper charge is<br />
system suction pressure during<br />
obtained.<br />
charging. Using a hot water or<br />
servicing charging heaters could<br />
solve this problem. Never use a<br />
brazing torch to heat cylinders.<br />
121 PSIG<br />
OPEN<br />
196 PSIG<br />
CLOSED OPEN<br />
Be<strong>for</strong>e connecting any refrigerant<br />
hose to a service or tap valve,<br />
the hose should be briefly purged<br />
(vented) with refrigerant from<br />
In general, follow the same connection<br />
the cylinder to ensure that air<br />
scheme as in evacuation process and<br />
replace the connection with vacuum pump<br />
with the refrigerant charging cylinder as<br />
shown here:<br />
CHAPITRE 4<br />
PAGE 18<br />
VAPOUR REFRIGIRENT CHARGING<br />
SUCTION PRESSURE<br />
50 PSIG<br />
Then:<br />
1 - Open the low-pressure side valve then open refrigerant graduated<br />
charging cylinder valve keeping eye on system pressure and<br />
refrigerant weight scale.<br />
2 - When the pressure has equalised between system and charging<br />
121<br />
PSIG<br />
R-22<br />
Vapour refrigerant charging<br />
and moisture does not enter the<br />
system.<br />
105