standard construction details - The Management System Parking Lot
standard construction details - The Management System Parking Lot
standard construction details - The Management System Parking Lot
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
18’-0"10’-0" 1’-0"#3 BARS ALIGNED WITHPAVEMENT REINFORCEMENT1’-0"A6 TYPE I-YELLOW BUTTONSBBON 30" C-C (TO BE INSTALLED& ORIENTED AS DIRECTED BYTHE ENGINEER).1’-0" 5’-0"1’-3"RPAY LINE & KEYEDCONSTRUCTION JOINTAMONOLITHIC MEDIAN NOSE#3 STIRRUP BARS6"3"PAY LINE & KEYEDCONSTRUCTION JOINTPAVEMENT REINF. BARSNOTE: MONOLITHIC MEDIAN NOSE & PAVEMENTWITHIN PAY LINES SHALL BE PAID FORPER EACH, COMPLETE IN PLACE.SECTION B-B1PAY LINE & KEYEDCONSTRUCTION JOINT33"1"RVARIABLE3" TO 6"12"SECTION A-AAPPROVEDDIRECTOR OF PUBLIC WORKS & TRANSPORTATIONDATE:PAVING DETAILSMONOLITHIC MEDIAN NOSEDEPARTMENT OF PUBLIC WORKS & TRANSPORTATIONCITY OF DALLAS, TEXASDESIGN DRAWN DATE FILE NO. PAGE NO.APRILC.O.D. A.B.&A. 251D 119971002