12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>LAND USE POLICIES3.8.2 Other ancillary uses shall be permitted subject to a site specific rezoning. Temporaryand Portable asphalt, concrete and crusher plants will be permitted without a site specificrezoning subject to the following provisions:i) a certificate <strong>of</strong> approval from the Ministry <strong>of</strong> Environment;ii) compliance with the Ministry <strong>of</strong> Environment minimum separation distancerequirement, but in no case shall they be located closer than 400 metres from anexisting residence;iii) removal from the site upon completion <strong>of</strong> the public project;iv) Sites in the agricultural areas will be rehabilitated to their former agricultural use andcapability.General Policies:3.8.3 Applications to designate and zone additional lands as Extractive Industrial Areas shallprovide the following information for consideration by the <strong>Town</strong>:i) Effect on the Natural Heritage System and Natural Environmental Areadesignations within 120 metres <strong>of</strong> the subject lands through the preparation <strong>of</strong> anEIS, a hydrogeology study and a stormwater management study;ii) A rehabilitation plan;iii) A site development plan which includes the following information:a) true shape, topography, contours, dimensions, size and location <strong>of</strong> the propertyto be rezoned as well as the extent <strong>of</strong> adjacent property held for future pit orquarry operations;b) The location, height, dimensions and use <strong>of</strong> all buildings or structures existingor proposed to be erected on the property;c) Existing and anticipated final grades <strong>of</strong> excavation, shown by contours wherenecessary, as well as excavation setbacks;d) Drainage provisions;e) All entrances and exits;f) As far as possible, ultimate pit development, progressive and ultimate roadplan, any water diversion or storage, location <strong>of</strong> stockpiles for stripping andproducts, progressive and ultimate rehabilitation, and where possible intendeduse <strong>of</strong> the land after the extractive operations have ceased; andg) Cross-sections through the deposit.iv) The haulage routes proposed to and from the site, the traffic volumes anticipatedand a traffic impact study.v) The effect <strong>of</strong> the operation on nearby communities including noise, dust andvibration concerns.vi) A <strong>Plan</strong>ning Assessment Report, which assess land use compatibility and policyconformity issues including the relevant policies <strong>of</strong> this <strong>Plan</strong>, except thatdemonstration <strong>of</strong> need shall not be required78Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!