12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>LAND USE POLICIESBusiness Park designation;v) the conversion will not adversely affect the achievement <strong>of</strong> other policies <strong>of</strong> this <strong>Plan</strong>including the minimum density in designated greenfield areas and theintensification targets <strong>of</strong> this plan;vi) no land use conflicts are created and provincial guidelines with respect to noise andair quality can be met; andvii) there is existing or planned infrastructure to accommodate the proposed use.Appeal #35 <strong>of</strong> Section 3.5.1 and all subjections thereto as it relates to <strong>Innisfil</strong> Heights.3.5.1.18 All development shall be served by the central water supply system. Until municipalsanitary servicing is available, only uses <strong>of</strong> a dry nature on private septic systems willbe permitted. Dry uses are considered to be uses which use water for domesticpurposes only which result in the production <strong>of</strong> domestic sewage.Appeal #35 <strong>of</strong> Section 3.5.1 and all subjections thereto as it relates to <strong>Innisfil</strong> Heights.3.5.1.19 Prior to municipal sanitary servicing being available, new development shalldemonstrate the appropriateness <strong>of</strong> the proposed lot sizes through a hydrogeologicalassessment, conducted by a qualified hydrogeologist, satisfactory to the <strong>Town</strong>, whichshall assess the assimilative capability <strong>of</strong> the soils. Such study shall be completed tothe satisfaction <strong>of</strong> the <strong>Town</strong> in consultation with the applicable conservation authority.Appeal #35 <strong>of</strong> Section 3.5.1 and all subjections thereto as it relates to <strong>Innisfil</strong> Heights.3.5.1.20 Before any major expansion <strong>of</strong> the water system occurs, a study shall be undertakento ensure that the present water supply is sufficient for the proposed type <strong>of</strong>development and the distribution system is adequately sized to maintain the requiredpressures over the ultimate service area. If upgrading <strong>of</strong> the water system is required,the costs shall be identified and incorporated into the development charges.Appeal #35 <strong>of</strong> Section 3.5.1 and all subjections thereto as it relates to <strong>Innisfil</strong> Heights.Site Specific Exceptions:3.5.1.21 The property in the north part <strong>of</strong> Lot 6, Concession 8 which is used forcemetery/crematorium shall be used only for those purposes.Appeal #35 <strong>of</strong> Section 3.5.1 and all subjections thereto as it relates to <strong>Innisfil</strong> Heights.3.5.1.22 A farm implement dealership may be permitted in the south half <strong>of</strong> Lot 6, Concession7, on an individual well provided there is an agreement with the <strong>Town</strong> to connect tothe water system when it is extended to this area.Appeal #35 <strong>of</strong> Section 3.5.1 and all subjections thereto as it relates to <strong>Innisfil</strong> Heights.68Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!