12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>LEFROY SECONDARY PLANd) Storm sewers in the Lefroy Secondary <strong>Plan</strong> area shall be designed inaccordance with the <strong>Town</strong> design standards.e) The specific size and location <strong>of</strong> storm water management ponds shall beestablished through a Functional Servicing Study prior to draft plan <strong>of</strong> subdivisionapproval or other development approvals in accordance with the policies <strong>of</strong>Section 13.3.14, the recommendations <strong>of</strong> the Master Servicing Study and thecriteria set out in Section 13.5.3.f) The Functional Servicing Study shall further identify and refine infiltration areasas well as mechanisms to increase infiltration in such areas and to maintain orimprove the existing hydrologic function to the provincially significant wetlandfeatures and natural heritage features to ensure no negative impact.g) The Lefroy Master Drainage <strong>Plan</strong> (Appendix 2 to the Master Servicing Study)identified the need for further detailed drainage study <strong>of</strong> the south-eastneighbourhood. This study shall be undertaken as part <strong>of</strong> the FunctionalServicing Study conducted for that neighbourhood and shall include a detaileddrainage study that in addition to the requirements <strong>of</strong> Section 13.5.3 c) identifies:i) the boundary <strong>of</strong> the drainage divides and any subwatersheds;ii) the location <strong>of</strong> the existing drainage outlets for the sub-watershed areas;iii) the capacity <strong>of</strong> the downstream conveyances;iv) the specific location <strong>of</strong> the stormwater management pond(s) necessary tomaintain existing drainage boundaries; andv) the conceptual design <strong>of</strong> the stormwater management pond(s) consideringthe high groundwater table.13.8 URBAN DESIGN POLICIES13.8.1 Design Objectivesa) Lefroy is primarily a residential community that is integrated with its ruralsurroundings, and contains a number <strong>of</strong> natural and historic features that reflectthe unique character <strong>of</strong> the community.b) The following objectives form the basis for the preparation <strong>of</strong> detailed urbandesign guidelines for both the existing developed lands and the newly developinglands:i) To incorporate and enhance natural features;ii) To develop a strong community image/character;iii) To enhance connectivity between the 4 neighbourhoods <strong>of</strong> the Secondary<strong>Plan</strong> area;iv) To create compact urban form to promote efficient use <strong>of</strong> infrastructure;v) To create and maintain pedestrian-scaled neighbourhoods;223Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!