12.07.2015 Views

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

Innisfil Official Plan OMB Approved - Town of Innisfil

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Town</strong> <strong>of</strong> <strong>Innisfil</strong> <strong>Official</strong> <strong>Plan</strong>LEFROY SECONDARY PLANb) The design <strong>of</strong> the sanitary sewer system in the Lefroy Secondary <strong>Plan</strong> shall beby gravity flow where possible, to minimize the need for new pumping stationsand shall be designed to <strong>Town</strong> standards.c) The <strong>Town</strong> shall monitor the available sewage treatment capacity and shallallocate capacity in accordance with a monitoring program, the phasing plan inSection 13.9.1 and future plant expansion requirements.13.7.3 Water Supplya) Water supply acceptable to the <strong>Town</strong> shall generally be provided by theproposed municipal water distribution system that is intended to serve theCommunity <strong>of</strong> Lefroy. Existing and proposed trunk watermains in the municipalwater distribution system area including a required storage facility are shown onSchedule D5. Those external trunk watermains and storage facilities servingLefroy including portions <strong>of</strong> the Lakeshore Watermain and the water storagefacility shall be provided prior to occupancy <strong>of</strong> the first plan <strong>of</strong> subdivision inLefroy, except as set out in Section 13.7.3 c). These works shall be front-endedby the developers within Lefroy and reimbursed through a method mutuallyagreed by the developers and the <strong>Town</strong>.b) The <strong>Town</strong> shall monitor the available water treatment capacity and shall allocatecapacity in the Secondary <strong>Plan</strong> area in accordance with a monitoring program,the phasing plan in Section 13.9.1 and future plant expansion requirements.c) Notwithstanding Section 13.7.3 a), prior to the construction <strong>of</strong> portions <strong>of</strong> thelakeshore water main as shown on Schedule D5, an interim phase <strong>of</strong>development may be permitted with water supply provided by the Bradford WestGwillimbury water main in order to allow for the orderly and economical extension<strong>of</strong> water supply services. The Functional Servicing Study shall determine thephasing and means <strong>of</strong> financing portions <strong>of</strong> the lakeshore water main with a fiscalplan required as a condition <strong>of</strong> draft plan approval.13.7.4 Storm Drainagea) Quality and quantity stormwater management ponds shall be used as part <strong>of</strong> thestorm water management system for the Lefroy Secondary <strong>Plan</strong> area.b) The storm water management system for the Lefroy Secondary <strong>Plan</strong> area shallcontrol peak run<strong>of</strong>f rates to a level equal to or less than predevelopment rates.The storm water management system should include storm water infiltrationfacilities as recommended and determined to be feasible within the MasterServicing Study. In addition, the proposed stormwater management system is toaddress water quality and potential downstream erosion and existingdownstream flooding to the extent possible.c) In addition, the Functional Servicing Study is to review and consider the existingdownstream flooding concerns and recommend potential remedial measures thatcould be incorporated into the FSS for the lands upstream <strong>of</strong> the railway tracks orcould be implemented downstream in the existing areas <strong>of</strong> the <strong>Town</strong>.222Adopted July 26, 2006 <strong>Approved</strong> by <strong>OMB</strong> May 2009, March 2010 & April 8, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!